Title Observation Resolution plan Closure letter
Development of the generic E3S case RO-RRSMR-001 RO-RRSMR-001 resolution plan RO-RRSMR-001 closure letter
PSA Project Plan and Integration RO-RRSMR-002 RO-RRSMR-002 resolution plan RO-RRSMR-002 closure letter
Design Basis Maintenance assumptions and redundancy requirements for Class 2 safety measures RO-RRSMR-003 RO-RRSMR-003 resolution plan  
Site autonomy following extended LOOP RO-RRSMR-004 RO-RRSMR-004 resolution plan  
Internal Hazards safety case scope and delivery RO-RRSMR-005 RO-RRSMR-005 resolution plan RO-RRSMR-005 closure letter
Decommissioning E3S case for the generic Rolls-Royce SMR design RO-RRSMR-006 RO-RRSMR-006 resolution plan  
Safety Case for Spent Fuel Pool and Fuel Route Faults   RO-RRSMR-007 RO-RRSMR-007 resolution plan  
Reliability claims and methodology for seismic isolation system RO-RRSMR-008 RO-RRSMR-008 resolution plan  
Safety Case for Hydrogen Management in Severe Accidents RO-RRSMR-009 RO-RRSMR-009 resolution plan  
Demonstration of the appropriate power rating and performance capability of the Electrical Power System RO-RRSMR-010 RO-RRSMR-010 resolution plan  
Demonstration of consideration of conventional health and safety risks during the design stage RO-RRSMR-011 RO-RRSMR-011 resolution plan  
Equipment qualification arrangements and demonstration RO-RRSMR-012 RO-RRSMR-012 resolution plan  
Consideration of chemistry effects during severe accidents RO-RRSMR-013 RO-RRSMR-013 resolution plan  
Cyber Security assessment submissions RO-RRSMR-014 RO-RRSMR-014 resolution plan  
Component diversity RO-RRSMR-015 RO-RRSMR-015 resolution plan  
Optimising occupational radiation exposure in the development of the generic design RO-RRSMR-016 RO-RRSMR-016 resolution plan  