Sellafield - Inspection ID: 54489

Executive summary

Date(s) of inspection

  • September 2026

Aim of inspection

To gain assurance that, following the implementation of a ‘CDM enclave’ on the Calder Hall site, the Construction (Design and Management) Regulations 2015 (CDM) are being implemented and all duties complied with to ensure work can be carried out without risks to the health and safety of operatives on site.

Subject(s) of inspection

  • CDM 15 (Client / PD / PC duties) - Rating: Green
  • LC35 - Decommissioning - Rating: Green

Key findings, inspector's opinions and reasons for judgement made

ONR undertook an inspection of the Calder Hall site to seek assurance that the Construction (Design and Management) Regulations 2015 (CDM) are being implemented following the establishment of a CDM enclave, and that arrangements are in place to manage the principal conventional health and safety risks identified through the Calder Hall risk profile, namely work at height, fire, electrical safety and asbestos. The inspection also considered how the pilot Risk Case approach is influencing LC35 decommissioning arrangements.

The inspection found that Sellafield Ltd has arrangements in place for the CDM client role, including liaison with the principal designer, principal contractor and wider project team. Evidence reviewed included governance records, project board minutes, dashboards, risk assessments and information obtained during the site walkdown. ONR was satisfied that the current projects are being managed without risks to the health and safety of operatives and the wider site, although targeted follow-up is required on specific matters.

The inspection found that the pilot Risk Case approach to provide a ‘one stop shop’ for dutyholders of the main hazards and risks on site has been well received and supported by the LC35 and LC14 (Safety Case) process owners. The temporary arrangements which were approved via a variation to LC35 (Decommissioning) align with the safety case rationalisation in the Decommissioning Delivery Approach for Calder Hall (see DDA in documents section).

Regulatory advice was provided to site to consider creating a CDM enclave which includes the entire Calder Hall site as I have concerns about the increased risk relating to vehicles and individuals transiting the Calder site when demolition and construction activity on this and adjacent sites increases.

Conclusion

I judge that Sellafield Ltd has demonstrated adequate arrangements for managing the inspected aspects of the Calder Hall works, including the discharge of relevant CDM duties and the management of conventional health and safety risks associated with current decommissioning and demolition activities. However, further clarification and targeted follow-up is required.

  • There was insufficient evidence to demonstrate how the duty to ‘plan, manage and monitor the PCI and co-ordinate health and safety matters’ is fulfilled. I will follow this up with the Corporate Construction Team.
  • It was not clear how much detail is included in the Risk Case, where the information is sourced and whether links to risk assessments, method statements and surveys are included. I have arranged a follow up meeting to discuss this further.
  • During the site walkdown Erith Group were observed dismantling internal sections of turbine hall A with an excavator. ONR will review the risk assessment and method statement due to concerns raised about the presence of damaged bonded asbestos cement sheets in the debris.

These matters do not alter the overall inspection judgement and will be progressed through normal regulatory follow-up arrangements.