| GDA issue |
GDA issue ref |
Resolution plan |
Revised resolution plan schedules or revised resolution plans |
Closure report |
| Internal Hazards |
| Internal Fire Safety Case Substantiation |
GI-AP1000-IH-01 GDA Issue |
GI-AP1000-IH-01 Resolution Plan |
GI-AP1000-IH-01 Revised Resolution Plan |
GI-AP1000-IH-01 Closure Report |
| Internal Flooding Safety Case |
GI-AP1000-IH-02 GDA Issue |
GI-AP1000-IH-02 Resolution Plan |
GI-AP1000-IH-02 Revised Resolution Plan |
GI-AP1000-IH-02 Closure Report |
| Pressure Part Failure |
GI-AP1000-IH-03 GDA Issue |
GI-AP1000-IH-03 Resolution Plan |
GI-AP1000-IH-03 Revised Resolution Plan |
GI-AP1000-IH-03 Closure Report |
| Internal Explosion Safety Case Substantiation |
GI-AP1000-IH-04 GDA Issue |
GI-AP1000-IH-04 Resolution Plan |
GI-AP1000-IH-04 Revised Resolution Plan |
GI-AP1000-IH-04 Closure Report |
| Internal Missile Safety Case |
GI-AP1000-IH-05 GDA Issue |
GI-AP1000-IH-05 Resolution Plan |
GI-AP1000-IH-05 Revised Resolution Plan |
GI-AP1000-IH-05 Closure Report |
| Substantiation and Analysis of the Consequences of Dropped Loads and Impact from Lifting Equipment Included Within the AP1000 Design |
GI-AP1000-IH-06 GDA Issue |
GI-AP1000-IH-06 Resolution Plan |
GI-AP1000-IH-06 Revised Resolution Plan |
GI-AP1000-IH-06 Closure Report |
| Civil Engineering |
| Justification of Novel Form of Structure for the Steel/ Concrete Composite Walls and Floors Known as CA Modules |
GI-AP1000-CE-01 GDA Issue |
GI-AP1000-CE-01 Resolution Plan |
GI-AP1000-CE-01 Revised Resolution Plan |
GI-AP1000-CE-01 Closure Report |
| Further Justification of Novel Form of Structure for Steel / Concrete Composite Wall to the Enhanced Shield Building |
GI-AP1000-CE-02 GDA Issue |
GI-AP1000-CE-02 Resolution Plan |
GI-AP1000-CE-02 Revised Resolution Plan |
GI-AP1000-CE-02 Closure Report |
| AP1000 Material Standards and Material Specifications |
GI-AP1000-CE-03 GDA Issue |
GI-AP1000-CE-03 Resolution Plan |
GI-AP1000-CE-03 Revised Resolution Plan |
GI-AP1000-CE-03 Closure Report |
| Fuel Handling Area Secondary Containment Leak Detection and Collection System |
GI-AP1000-CE-04 GDA Issue |
GI-AP1000-CE-04 Resolution Plan |
GI-AP1000-CE-04 Revised Resolution Plan |
GI-AP1000-CE-04 Closure Report |
| Probabilistic Safety Analysis (PSA) |
| Success Criteria for the PSA |
GI-AP1000-PSA-01 GDA Issue |
GI-AP1000-PSA-01 Resolution Plan |
GI-AP1000-PSA-01 Revised Resolution Plan |
GI-AP1000-PSA-01 Closure Report |
| Fire PSA |
GI-AP1000-PSA-02 GDA Issue |
GI-AP1000-PSA-02 Resolution Plan |
GI-AP1000-PSA-02 Revised Resolution Plan |
GI-AP1000-PSA-02 Closure Report |
| Fault Studies |
| Spent Fuel Pool Safety Case |
GI-AP1000-FS-01 GDA Issue |
GI-AP1000-FS-01 Resolution Plan |
GI-AP1000-FS-01 Revised Resolution Plan |
GI-AP1000-FS-01 Closure Report |
| Design Reference Point and Adequacy of Design Basis Analysis |
GI-AP1000-FS-02 GDA Issue |
GI-AP1000-FS-02 Resolution Plan |
GI-AP1000-FS-02 Revised Resolution Plan |
GI-AP1000-FS-02 Closure Report |
| Diversity for Frequent Faults |
GI-AP1000-FS-03 GDA Issue |
GI-AP1000-FS-03 Resolution Plan |
GI-AP1000-FS-03 Revised Resolution Plan |
GI-AP1000-FS-03 Closure Report |
| Use of In-core Detectors to Protect Against Adverse Power Distributions |
GI-AP1000-FS-04 GDA Issue |
GI-AP1000-FS-04 Resolution Plan |
GI-AP1000-FS-04 Revised Resolution Plan |
GI-AP1000-FS-04 Closure Report |
| Potential Enhancements to the Diverse Safety Injection System |
GI-AP1000-FS-05 GDA Issue |
GI-AP1000-FS-05 Resolution Plan |
GI-AP1000-FS-05 Revised Resolution Plan |
GI-AP1000-FS-05 Closure Report |
| Validation of the IRWST Cooling Function for the PRHR |
GI-AP1000-FS-06 GDA Issue |
GI-AP1000-FS-06 Resolution Plan |
GI-AP1000-FS-06 Revised Resolution Plan |
GI-AP1000-FS-06 Closure Report |
| Safety Case for Shutdown Faults |
GI-AP1000-FS-07 GDA Issue |
GI-AP1000-FS-07 Resolution Plan |
GI-AP1000-FS-07 Revised Resolution Plan |
GI-AP1000-FS-07 Closure Report |
| Fault Schedule for AP1000 |
GI-AP1000-FS-08 GDA Issue |
GI-AP1000-FS-08 Resolution Plan |
GI-AP1000-FS-08 Revised Resolution Plan |
GI-AP1000-FS-08 Closure Report |
| Control & Instrumentation |
| Adequacy of Safety Case for DAS |
GI-AP1000-CI-01 GDA Issue |
GI-AP1000-CI-01 Resolution Plan |
GI-AP1000-CI-01 Revised Resolution Plan |
GI-AP1000-CI-01 Closure Report |
| DAS Adequacy of Architecture |
GI-AP1000-CI-02 GDA Issue |
GI-AP1000-CI-02 Resolution Plan |
GI-AP1000-CI-02 Revised Resolution Plan |
GI-AP1000-CI-02 Closure Report |
| Diversity Between the PMS (CIM) and DAS |
GI-AP1000-CI-03 GDA Issue |
GI-AP1000-CI-03 Resolution Plan |
GI-AP1000-CI-03 Revised Resolution Plan |
GI-AP1000-CI-03 Closure Report |
| PMS Spurious Operation |
GI-AP1000-CI-04 GDA Issue |
GI-AP1000-CI-04 Resolution Plan |
GI-AP1000-CI-04 Revised Resolution Plan |
GI-AP1000-CI-04 Closure Report |
| SMART Device Justification for Use |
GI-AP1000-CI-05 GDA Issue |
GI-AP1000-CI-05 Resolution Plan |
GI-AP1000-CI-05 Revised Resolution Plan |
GI-AP1000-CI-05 Closure Report |
| Ovation Platform - Adequacy of Safety Case |
GI-AP1000-CI-06 GDA Issue |
GI-AP1000-CI-06 Resolution Plan |
GI-AP1000-CI-06 Revised Resolution Plan |
GI-AP1000-CI-06 Closure Report |
| DCIS - Adequacy of Safety Case |
GI-AP1000-CI-07 GDA Issue |
GI-AP1000-CI-07 Resolution Plan |
GI-AP1000-CI-07 Revised Resolution Plan |
GI-AP1000-CI-07 Closure Report |
| PMS - Adequacy of Safety Case |
GI-AP1000-CI-08 GDA Issue |
GI-AP1000-CI-08 Resolution Plan |
GI-AP1000-CI-08 Revised Resolution Plan |
GI-AP1000-CI-08 Closure Report |
| CIM - Adequacy of Safety Case |
GI-AP1000-CI-09 GDA Issue |
GI-AP1000-CI-09 Resolution Plan |
GI-AP1000-CI-09 Revised Resolution Plan |
GI-AP1000-CI-09 Closure Report |
| Class 1 Displays and Controls |
GI-AP1000-CI-010 GDA Issue |
GI-AP1000-CI-010 Resolution Plan |
GI-AP1000-CI-010 Revised Resolution Plan |
GI-AP1000-CI-010 Closure Report |
| Essential Electrical Systems |
| PCSR Presentation of Claims Arguments and Evidence |
GI-AP1000-EE-01 GDA Issue |
GI-AP1000-EE-01 Resolution Plan |
GI-AP1000-EE-01 Revised Resolution Plan |
GI-AP1000-EE-01 Closure Report |
| Fuel Design |
| Fuel Pin Modelling Safety Justification |
GI-AP1000-FD-01 GDA Issue |
GI-AP1000-FD-01 Resolution Plan |
GI-AP1000-FD-01 Revised Resolution Plan |
GI-AP1000-FD-01 Closure Report |
| Tolerability of Depressurisation Forces in LBLOCA |
GI-AP1000-FD-02 GDA Issue |
GI-AP1000-FD-02 Resolution Plan |
GI-AP1000-FD-02 Revised Resolution Plan |
GI-AP1000-FD-02 Closure Report |
| Use of the BEACON Code for On-line Compliance |
GI-AP1000-FD-03 GDA Issue |
GI-AP1000-FD-03 Resolution Plan |
GI-AP1000-FD-03 Revised Resolution Plan |
GI-AP1000-FD-03 Closure Report |
| Reactor Chemistry |
| Accident Source Terms |
GI-AP1000-RC-01 GDA Issue |
GI-AP1000-RC-01 Resolution Plan |
GI-AP1000-RC-01 Revised Resolution Plan |
GI-AP1000-RC-01 Closure Report |
| Primary Sampling System |
GI-AP1000-RC-02 GDA Issue |
GI-AP1000-RC-02 Resolution Plan |
GI-AP1000-RC-02 Revised Resolution Plan |
GI-AP1000-RC-02 Closure Report |
| Hydrogen Dosing System |
GI-AP1000-RC-03 GDA Issue |
GI-AP1000-RC-03 Resolution Plan |
GI-AP1000-RC-03 Revised Resolution Plan |
GI-AP1000-RC-03 Closure Report |
| Radiation Protection |
| Spent Fuel Pool Criticality Safety Case |
GI-AP1000-RP-01 GDA Issue |
GI-AP1000-RP-01 Resolution Plan |
GI-AP1000-RP-01 Revised Resolution Plan |
GI-AP1000-RP-01 Closure Report |
| Mechanical Engineering |
| Squib Valve Concept and Design Substantiation |
GI-AP1000-ME-01 GDA Issue |
GI-AP1000-ME-01 Resolution Plan |
GI-AP1000-ME-01 Revised Resolution Plan |
GI-AP1000-ME-01 Closure Report |
| Metrication of Mechanical Equipment and Civil Structural Steelwork Connections |
GI-AP1000-ME-02 GDA Issue |
GI-AP1000-ME-02 Resolution Plan |
GI-AP1000-ME-02 Revised Resolution Plan |
GI-AP1000-ME-02 Closure Report |
| Mechanical System Pipework Design |
GI-AP1000-ME-03 GDA Issue |
GI-AP1000-ME-03 Resolution Plan |
GI-AP1000-ME-03 Revised Resolution Plan |
GI-AP1000-ME-03 Closure Report |
| Structural Integrity |
| Avoidance of Fracture |
GI-AP1000-SI-01 GDA Issue |
GI-AP1000-SI-01 Resolution Plan |
GI-AP1000-SI-01 Revised Resolution Plan |
GI-AP1000-SI-01 Closure Report |
| Fatigue Analysis |
GI-AP1000-SI-02 GDA Issue |
GI-AP1000-SI-02 Resolution Plan |
GI-AP1000-SI-02 Revised Resolution Plan |
GI-AP1000-SI-02 Closure Report |
| Reactor Coolant Pump |
GI-AP1000-SI-03 GDA Issue |
GI-AP1000-SI-03 Resolution Plan |
GI-AP1000-SI-03 Revised Resolution Plan |
GI-AP1000-SI-03 Closure Report |
| Containment Vessel |
GI-AP1000-SI-04 GDA Issue |
GI-AP1000-SI-04 Resolution Plan |
GI-AP1000-SI-04 Revised Resolution Plan |
GI-AP1000-SI-04 Closure Report |
| Compliance of AP1000 Main Structural Components with ASME III Design Rules |
GI-AP1000-SI-05 GDA Issue |
GI-AP1000-SI-05 Resolution Plan |
GI-AP1000-SI-05 Revised Resolution Plan |
GI-AP1000-SI-05 Closure Report |
| Categorisation and Classification |
GI-AP1000-SI-06 GDA Issue |
GI-AP1000-SI-06 Resolution Plan |
GI-AP1000-SI-06 Revised Resolution Plan |
GI-AP1000-SI-06 Closure Report |
| Human Factors |
| Completeness of the HF Safety Case |
GI-AP1000-HF-01 GDA Issue |
GI-AP1000-HF-01 Resolution Plan |
GI-AP1000-HF-01 Revised Resolution Plan |
GI-AP1000-HF-01 Closure Report |
| Cross-Cutting |
| Limits and Conditions |
GI-AP1000-CC-01 GDA Issue |
GI-AP1000-CC-01 Resolution Plan |
GI-AP1000-CC-01 Revised Resolution Plan |
GI-AP1000-CC-01 Closure Report |
| PCSR to Support GDA |
GI-AP1000-CC-02 GDA Issue |
GI-AP1000-CC-02 Resolution Plan |
GI-AP1000-CC-02 Revised Resolution Plan |
GI-AP1000-CC-02 Closure Report |
| Consider and Action Plans to Address the Lessons Learnt from the Fukushima Event |
GI-AP1000-CC-03 GDA Issue |
GI-AP1000-CC-03 Resolution Plan |
GI-AP1000-CC-03 Revised Resolution Plan |
GI-AP1000-CC-03 Closure Report |