Executive summary
Date(s) of inspection
- September 2026
Aim of inspection
The purpose of this inspection was to sample evidence of the adequacy of EDF Nuclear Generation Limited's (NGL's) Supply Chain Management arrangements for work conducted at Heysham 1 to inform a regulatory judgement regarding the licensee’s compliance with LC17, LC 28 and associated relevant good practice.
Specifically, this inspection looked to seek assurance that Heysham 1’s supply chain management arrangements, adequately controlled risks from poor quality items in line with relevant good practice and regulatory expectations.
Subject(s) of inspection
- LC17 - Management systems - Rating: Green
- LC28 - Examination, inspection, maintenance and testing - Rating: Green
Key findings, inspector's opinions and reasons for judgement made
I sampled EDF NGL procedural documents in advance of and during my inspection.
I conducted interviews with EDF NGL workers during my inspection, sampled supporting evidence (documents and records) and undertook a plant walkdown to view some of the work sampled.
I noted from my sampling that;
- Requirements for product are mainly adequately defined.
- Quality controls are being applied following a risk graded approach.
- Product is being mainly adequately maintained.
- Oversight of the Supply Chain remains adequate.
I considered that the shortfalls identified from my samples were not significant, and provided some regulatory advice, which will be monitored through routine regulatory engagements.
In my opinion EDF NGL demonstrated from the sample set of evidence that;
- Management System (LC) 17 arrangements (including Quality Control) for spares were being adequately made and implemented, and;
- Arrangements for Examination, Inspection, Maintenance and Testing LC (28) of spares was found to be adequately deployed.
Conclusion
I concluded based upon my sample of Supply Chain, Spares and Quality Control that management system arrangements, including examination, inspection, maintenance and testing of product were adequately made and implemented.
I judged that adequate arrangements had been made and implemented in accordance with LC17 and LC28 requirements.
Overall I was satisfied that within the scope of my sample there are no significant shortfalls in the EDF NGL supply chain quality management arrangements for the management of spares against the requirements of Licence Condition 17 and 28. I have therefore rated the inspection ‘GREEN’ (no formal action required).