Sizewell C - Inspection ID: 54202

Executive summary

Date(s) of inspection

  • August 2026

Aim of inspection

The aim of the inspection was to inspect the implementation of Sizewell C Ltd's (SZC) arrangements for compliance with Licence Condition (LC) 19 – construction or installation of new plant and LC (10) - training in relation to arrangements for controlling quality during construction. LC19 requires that where the licensee proposes to construct or install any new plant, which may affect safety, the licensee makes and implements adequate arrangements to control the construction or installation. LC10 requires the licensee to implement adequate arrangements for suitable training for those who have responsibility on operations which may affect safety.

The inspection aimed to obtain evidence in relation to the adequacy of SZC's arrangements for the control of construction quality on site. The particular focus of the inspection was on the adequacy of arrangements to ensure conformant construction, in accordance with the design intent and safety case.

Subject(s) of inspection

  • LC10 - Training - Rating: Green
  • LC19 - Construction or installation of new plant - Rating: Amber

Key findings, inspector's opinions and reasons for judgement made

This Licence Condition (LC) 19 (construction or installation of new plant) and LC 10 (training) compliance inspection was carried out on 5 and 6 August 2026 at Sizewell C (SZC).

The inspection focused on the adequacy of SZC arrangements for managing construction quality at SZC. The inspection was carried out to gain confidence that adequate arrangements are in place to manage construction quality, and that those arrangements are being implemented appropriately.

The inspection initially comprised of an office based discussion on the structure of construction quality control arrangements.

The discussion was followed by a site walkdown the next morning, where I visited zone 3 cut off wall (COW), temporary sea defence (TSD) and site of special scientific interest (SSSI) crossing. During the site walkdown, we sampled the management of non-conformance records (NCRs), field change requests (FCRs) and inspection test plans (ITPs).

The inspection concluded in the office the same afternoon, with a review of documentation and quality records in support of the areas sampled on the site visit.

On the basis of the evidence sampled, I judge that SZC's construction quality arrangements appeared broadly in compliance with LC19 (construction or installation of new plant). However, a small number of shortfalls were identified specifically against the clarity and consistency of some of the sampled construction quality records.

Upon consideration of the ONR guidance in relation to inspection ratings, and in recognition of the shortfalls observed, I judge that a rating of Amber is appropriate.

A level 4 regulatory (RI-13193) issue has been raised to track bringing the shortfalls in clarity and consistency of quality records into compliance.

It is noted that on the basis of the evidence sampled for the LC10 element of the inspection, I judge that SZC's arrangements were in line with expectations. The LC10 element of the inspection has been assigned a Green rating.

I made an observation relating to some required improvements in relation to People Vehicle Plant Interface (PVPI), and nuclear site health and safety colleagues were provided with details to follow up on.

Conclusion

On the basis of the evidence samples, I judge that SZC's construction quality arrangements appeared broadly in compliance with LC19 (construction or installation of new plant). However, several shortfalls were identified with the implementation of the arrangements, specifically against the clarity and consistency of some construction quality records.

Upon consideration of the ONR guidance in relation to inspection ratings, and in recognition of the shortfalls mentioned above, I judge that a rating of Amber is appropriate.

A Level 4 regulatory issue (RI-13193) shall be raised to track bringing the shortfalls in clarity and consistency of quality records into compliance.

It is noted that on the basis of the evidence sampled for the LC 10 element of the inspection, I judge that SZC's arrangements were inline with expectations. The LC10 element of the inspection has been provided a Green rating.