Sizewell B - Inspection ID: 53816

Executive summary

Date(s) of inspection:

September 2025

Aim of inspection

The aims of the inspection are:

for specialist fire safety inspectors ( Internal Hazards and conventional fire safety) to sample arrangements at the EDF Energy Nuclear Generation Limited Sizewell B site (SZB) to determine the adequacy of compliance with the Regulatory Reform (Fire Safety) Order 2005 and Site Licence Condition (LC) 19 in the construction of new plant and control of modifications with regard to fire safety; and

to ensure that fire risks associated with the control of modifications and construction of new plant are reduced as so far as is reasonably practicable. Fire hazards, if not controlled, can present risks to safety. It is therefore important that the risks from fire are adequately controlled.

Subject(s) of inspection

  • Fire (Life Safety) Compliance Inspection - Rating: Amber
  • LC19 - Construction or installation of new plant - Rating: Amber

Key findings, inspector's opinions and reasons for judgement made

This inspection consisted of a review of arrangements at the EDF Energy Nuclear Generation Limited Sizewell B (SZB) to determine compliance with the Regulatory Reform (Fire Safety) Order 2005 and Site Licence Condition (LC) 19 in the construction of new plant and control of modifications with regard to fire safety.

The inspection considered control of modifications arrangements in relation to the construction of the New Outage Store and Administration Building -Training Centre at SZB. Management arrangement shortfalls were identified in the control of modifications for these new buildings and therefore both the Fire Safety Order and Licence Condition 19 elements of the inspection were awarded an AMBER rating.

The conclusion of the inspection was that SZB's proposed fire strategy for the Training Centre and the Administration Building did not reduce risks to occupants to ALARP. ONR’s influence through building control consultation resulted in the risk to occupants as a result of the potential for fire spread between the Training Centre and the Administration Building being reduced from the original proposal. It was not clear whether the shortfall was as a result of SZB’s arrangements or the implementation of those arrangements.

From the evidence provided in relation to the new Outage Store, the inspection concluded that SZB did not adequately consider the hazards associated with the hydrogen facility in the siting and design of the new Outage Store. It was not clear whether the shortfall was as a result of SZB’s arrangements or the implementation of those arrangements.

Conclusion

The inspection considered the adequacy of compliance with the Regulatory Reform (Fire Safety) Order 2005 and Site Licence Condition (LC) 19 in the construction of new plant and control of modifications with regard to fire safety. Shortfalls were identified in regards to the control of modifications in these areas and therefore award an AMBER rating to both the Fire Safety Order and Licence condition elements of the inspection. ONR has further considered these shortfalls in line with the requirements of its Enforcement Management Model and raised a Level 3 Regulatory Issue.