This Licence Compliance Inspection was carried out as one of a series of planned inspections for the Chapelcross (CHX) decommissioning site during 2019/20.
I carried out a Themed Licence Compliance inspection on CHX’s Licence Condition (LC) 7, 12, 24, and 26 arrangements for control of operations and their implementation. In addition, I held on-site meetings that included a quarterly meeting with the CHX Safety Representatives.
N/A.
From the documentation sampled and the areas inspected, I judged that CHX’s arrangements made under LCs 7, 12, 24, and 26 for the control of operations and their implementation were adequate.
No regulatory concerns were identified as a result of the inspection and future engagement will continue as detailed in the 2019/20 inspection plan.