Executive summary

Purpose of Intervention

The purpose of this intervention was to undertake a Licence Condition (LC) 28 compliance inspection at EDF Energy Nuclear Generation Limited (NGL) Hinkley Point B Power Station (HPB), in line with the inspection programme contained in the HPB Integrated Intervention Strategy (IIS) for 2018/19.

Interventions Carried Out by ONR

We undertook a planned inspection and assessment of implementation of the arrangements for LC 28 Examination, inspection, maintenance and testing (EIMT) at Hinkley Point B Power Station.

The inspection sample targeted the planned electrical work being undertaken as part of the Reactor (R) 3 and Turbo Alternator (TA) 7 2019 periodic shutdown, including the planned electrical EIMT activities from the station’s outage intentions document, the implementation of modifications and any reactive electrical work emergent from the shutdown.

Explanation of Judgement if Safety System Not Judged to be Adequate

Not applicable.

Key Findings, Inspector's Opinions and Reasons for Judgements Made

Based on the discussions, explanations and the sample inspected, on this occasion, we were satisfied that there were no significant shortfalls identified with the implementation of the established arrangements for LC 28 EIMT in relation to the planned electrical work undertaken as part of the Reactor 3 and Turbo Alternator 7 2019 periodic shutdown. The targeted inspection undertaken confirmed that the planned EIMT and modification activities during this shutdown were appropriate and that electrical plant and equipment that was being maintained and modified was in accordance with the established arrangements. 

We identified, however, that there were a number of anomalies on a number of different maintenance documents. We judged that anomalies identified were minor. Notwithstanding this, the anomalies required addressing. The Lead Protection and Electrical Coordinator committed to address the anomalies identified and revise any of the affected documents. We were satisfied, given the minor nature of the anomalies that it was appropriate to follow this up at a future intervention under normal regulatory business.

Notwithstanding the finding above, overall, the outcome from the safety inspection of the shutdown related electrical activities for the Reactor 3 and Turbo Alternator 7 2019 periodic shutdown was that the implementation of the LC 28 arrangements for the electrical equipment was found to be adequate; therefore a green inspection rating was awarded.

The intervention was performed in line with ONR's guidance requirements (as described in our technical inspection guides) in the areas inspected.

Conclusion of Intervention

From the sample inspected, it is judged that for the electrical work activities undertaken at Hinkley Point B during the Reactor 3 and Turbo Alternator 7 2019 periodic shutdown, compliance against LC28 met the required standard, therefore a ‘Green’ rating was given.

Based on these targeted interventions there were no issues identified from the electrical work activities which would prevent ONR granting Consent for Reactor 3 to return to service. This is subject to the completion of the planned EIMT activities, the implementation of modifications and the completion of emergent electrical work.

From the evidence gathered during these interventions, there were no matters identified that have the potential to impact significantly on nuclear safety.