Intervention records - 2014/15

Intervention records are written by our inspectors following visits to the sites we regulate. They are used to record findings and, if appropriate, any significant actions we require the site operator to carry out in order to improve matters.

Publishing executive summaries of these reports is one part of ONR's aim to be open and transparent by helping all of our stakeholders, including the public, understand our work.

A new sequential numbering system beginning with a series 100 onwards will be used on all intervention records dated 1 July 2014 onwards.

Non-site specific

IR no LC no(s) Date Title
14-233 N/A March 2015 Inspection of Magnox Corporate Arrangements for Design Authority and Intelligent Customer
14-152 22 October 2014 Inspection of Berkeley equipment being manufactured at Whetstone by Cavendish Ltd
14-131 32 August 2014 Witnessing off-site testing of equipment for emptying Berkeley intermediate level waste ILW vaults
14-100 36 July 2014 Magnox Limited, Berkeley CentreAssessment of Magnox Limiteds management of the organisational changes associated with transition to a new parent body organisation (PBO)
14-006 N/A June 2014 University of Bristol, Level 4 Meeting and Inspection of AGR graphite core shaker table test rig
14-001 36 June 2014 Research Sites Restoration Limited (RSRL), Harwell Assessment of RSRL's management of the organisational changes associated with transition to a new parent body organisation
14-001 N/A April 2014 ALARP Workshop

Berkeley [Nuclear Site Licence 92]

IR no LC no(s) Date Title
14-210 28, 35, 36 February 2015 Berkeley nuclear licensed site planned inspection against licence conditions 28, 35 and 36 on operational records and control and supervision of operations
14-193 25, 26 January 2015 Planned Site Inspection against Licence Conditions 25 and 26 on Operational Records and Supervision of Operations
14-171 10, 23, 24, 27, 28, 34 November 2014 Berkeley Nuclear Licenced Site Planned Inspections and Meetings
14-159 100 October 2014 Intervention on Control of Occupational Radiation Exposure - IRR99 Regulation 8
14-151 11, 22, 23, 24, 32, 107 September 2014 Berkeley nuclear licensed site planned inspections and meetings
14-123 N/A August 2014 Berkeley Centre Corporate Inspection
14-119 12, 103 July 20214 Berkeley licensed nuclear site for planned inspections in pursuit of the IIS plan for 2014/15
14-003 11 June 2014 Berkeley - System inspection of the reactor buildings
14-002 35 June 2014 Discussion on Radioactive Waste Management Plans for the Site
14-001 7, 17, 101, 106 May 2014 Inspection against nuclear site licence conditions

Bradwell [Nuclear Site Licence 92]

IR no LC no(s) Date Title
14-236 6, 25 March 2015 Bradwell Nuclear Licensed Site Planned Inspections and Meetings [14-236]
14-224 11, 24, 28 February 2015 Bradwell Nuclear Licensed Site Planned Inspections and Meetings [14-224]
14-212 23, 32, 34 January 2015 Bradwell Nuclear Licensed Site Planned Inspections and Meetings [14-212]
14-175 10, 23, 24, 27, 28, 34 November 2014 Bradwell Nuclear Licensed Site Planned Inspections and Meetings [14-175]
14-157 12 October 2014 Compliance Inspection and Joint Regulatory Project Update Meeting
14-147 35 September 2014 Bradwell site - Compliance Inspection, Annual Review of Safety and Joint Regulatory Project Update Meeting
14-121 N/A July 2014 Compliance Inspection and Joint Regulatory Project Update Meeting [14-121]
14-114 32 July 2014 Bradwell site - Readiness inspection in relation to the proposed conditioning (drying) of ILW in Ductile Cast Iron Containers
14-004 8, 22, 32 June 2014 Bradwell - Compliance Inspection
14-003 22 May 2014 Compliance Inspection and Joint Regulatory Project Update Meeting [14-003]
14-002 7, 11 April 2014 Bradwell Compliance Inspection and Joint Regulatory Update Meeting
14-001 12, 26 June 2014 Compliance Inspection and Joint Regulatory Project Update Meeting [14-001]

Chapelcross [Nuclear Site Licence 15]

IR no LC no(s) Date Title
14-205 11 March 2015 Chapelcross site inspection [14-205]
14-204 23, 24, 27, 28 February 2015 Chapelcross site inspection [14-204]
14-161 5, 7 December 2014 Chapelcross site inspection [14-161]
14-160 11, 12, 23, 24, 26, 28, 34 November 2014 Chapelcross site inspection [14-160]
14-126 10, 27 September 2014 Chapelcross Site inspection [14-126]
14-117 4, 36 August 2014 Chapelcross Site inspection [14-117]
14-001 11, 23, 24 May 2014 Chapelcross Site inspection [14-001]

Dounreay [Nuclear Site Licence 17]

IR no LC no(s) Date Title
14-235 10, 23,24, 27, 28 March 2015 Dounreay Cranes 25.4t SWL Sphere Goliath Crane, D1100, Dounreay Fast Reactor DFR & 27t SWL Crane, D2700, Dounreay Cementation Plant DCP
14-216 21, 22 February 2015 Inspection in support of IIS [14-216]
14-209 22, 26, 32 February 2015 Intervention to discuss the remaining lifetime of the Legacy Uranic Residue Processing Facilities
14-196 24 January 2014 Licence Condition 24 inspection of Dounreay Site and handover
14-195 4, 11, 15 January 2014 Dounreay Inspection in support of IIS
14-191 7, 26, 35, 36 January 2014 Conduct of Inspection in support of IIS
14-183 23, 24, 27, 28 January 2014 Dounreay - Licence Conditions 23, 24 and 27 Inspection of PFR & DFR & attendance at the Dounreay Site Stakeholder Group meeting 
14-178 23, 24, 27, 28, 34 November Conduct of Inspection in support of IIS [14-178]
14-170 22, 28, 35 November 2014 Licence Conditions 22, 28 and 35 Inspection of PFR and DFR, DSRL
14-169 17 November 2014 Dounreay Conduct of Inspection in support of IIS [14-169]
14-155 7 October 2014 Dounreay Conduct of Inspection in support of IIS [14-155]
14-141 23, 24, 28 September 2014 Dounreay - Site inspection visit
14-140 N/A September 2014 Dounreay - Site visit
14-133 11 September 2014 Dounreay - Emergency arrangements
14-125 22, 26 August 2014 Dounreay Inspection in support of IIS [14-125]
14-102 32 July 2014 Dounreay Inspection in support of IIS [14-102]
14-012 12, 26 June 2014 Licence Condition 26/12 inspection of PFR and DFR, DSRL
14-011 10, 23, 24, 27, 28, 34 May 2014 Dounreay DRSL Ionising Radiations Regulations 1999; Regulation 8: Control of Occupational Radiation Exposure (CORE) Inspection
14-010 7, 12, 26, 28 June 2014 Dounreay Site Inspection in Support of IIS
14-009 35 May 2014 LC35 inspection - Level 1 exercise
14-008 10, 12 May 2014 LC35 Inpection - Level 1 exercise
14-007 28 April 2014 To inspect the LC28 (1) arrangements for the inspection of civil engineering structures
14-006 23, 24, 27, 28, 10 April 2014 System Inspection of Assest Care of Civil Structures, DSLR
14-004 7, 35 April 2014 Dounreay Visit [14-004]
14-003 12 June 2014 Planned compliance inspection
14-002 11 April 2014 Electrical Outage Dounreay Planned Compliance Inspection
14-001 7 April 2014 Dounreay Visit [14-001]

Dungeness A [Nuclear Site Licence 94]

IR no LC no(s) Date Title
14-225 3, 11, 23, 28, 35 February 2015 Compliance Inspections and project meetings
14-202 26, 32, 34 January 2015 Dungeness A site inspection
14-165 10, 23, 24, 27, 28, 34 November 2014 Dungeness A System Compliance Inspection
14-156 11 October 2014 Dungeness A Level 1 Emergency Demonstration Exercise
14-136 11 September 2014 Review of Proposed Emergency Arrangements [14-136]
14-124 N/A August 2014 Review of Proposed Emergency Arrangements [14-124]
14-110 7, 28 June 2014 Dungeness A - Pond Crane Incident Preliminary Investigation
14-106 7, 14, 24, 28 July 2014 Dungeness A Compliance Inspection
14-003 8, 16, 24 May 2014 Compliance Inspection and Attendance at Dungeness Annual Review of Safety, Environment and Security
14-002 22, 23 April 2014 System Compliance Inspection

Dungeness B [Nuclear Site Licence 61]

IR no LC no(s) Date Title
14-227 10, 23, 24, 27, 28, 34 March 2015 Dungeness B planned intervention
14-210 10, 32, 34 February 2015 Inspection of fuel-related topics [14-210]
14-209 7, 32, 34, 36 February 2015 Dungeness B planned intervention [14-209]
14-200 10, 17, 23, 24, 27, 28 January 2015 Dungeness B planned inspection [14-200]
14-185 12, 22, 26, 102, 106, 108 December 2014 Dungeness B Planned Intervention [14-185]
14-181 10, 11, 23, 24, 28, 30, 34,108 November 2014 Planned intervention including system based inspection
14-160 4, 6, 28 October 2014 Dungeness B Planned Intervention [14-160]
14-151 N/A September 2014 Dungeness B Site Visit Covering Fire Improvements Projects and Turbine Hall Fire Event from July 2012
14-117 10, 23, 24, 27, 28, 34 September 2014 Dungeness B - Planned intervention
14-115 7, 24, 36 August 2014 EDF Energy Nuclear Generation Ltd (NGL) - Dungeness B (DNB) Planned Intervention
14-111 11, 23, 106, 108 July 2014 Dungess B - Planned Intervention [14-111]
14-104 N/A July 2014 Dungess B - Planned Intervention [14-106]
14-016 N/A June 2014 NGL Dungeness B Neutron Scatter Plug Management Programme Level 4 Meeting held at Barnwood
14-015 107, 108 June 2014 Dungeness B - Planned Inspection
14-014 28 April 2014 Inspection of the Mechanical aspects of the Maintenance conducted during the 2014 Dungeness B Reactor 21 Periodic Shutdown
14-013 28 May 2014 Dungeness B - Reactor 21 (R21) control and instrumentation (C&I) statutory outage inspection date
14-012 28 April 2014 Inspection of the Structural Integrity (Steel) aspects of maintenance conducted during the 2014 Dungeness B Reactor 21 periodic shutdown
14-011 28 April 2014 Dungeness B Power Station to witness pre-stressed concrete pressure vessel tendon surveillance activities on reactor 21
14-010 N/A April 2014 Radiological safety compliance Inspection in conformity with the ONR Civil Nuclear Reactor Programme Radiation Protection Plan
14-009 17 April 2014 Inspection to Support Reactor Outage Intervention Strategy Focusing on LC 17
14-008 10, 23, 24, 27, 28, 34 June 2014 Planned Intervention - SBI 22 (CO2 Storage and Distribution)
14-007 2, 28, 30 April 2014 EDF Energy Nuclear Generation Ltd (NGL) - Dungeness B (DNB) Planned Intervention [14-007]
14-006 28 April 2014 Dungeness Reactor 21 Statutory Outage 2014 - Graphite Structural Integrity Inspection
14-005 28 April 2014 Electrical Outage Inspection
14-004 21 April 2014 Readiness inspection of the DNB data processing computer system (DPCS)
14-003 N/A April 2014 Updated Safety Case for Plug Unit Weld Integrity
14-002 28 April 2014 Dungeness B - Planned Intervention [14-002]
14-001 22 April 2014 Dungeness B - Planned intervention [14-001]

EDF Energy Nuclear Generation Ltd corporate

IR no LC no(s) Date Title
14-119 32 July 2014 EDF Energy Nuclear Generation Ltd, Corporate Headquarters Barnwood, Radioactive Waste Management Arrangements Inspection
14-109 23 July 2014 ONR/EDF Fuel Route 6 Monthly Review Meeting - Barnwood
14-004 N/A May 2014 Hartlepool/Heysham 1 Hot Box Dome Project - Update on rising temperature trends
14-002 N/A April 2014 EDF Energy Nuclear Generation Limited (NGL), Barnwood - Probabilistic safety analysis (PSA) level 4 meeting

GE Healthcare [Nuclear Site Licence 32A]

IR no LC no(s) Date Title
14-127 6, 12 26 September 2014 Inspection of arrangements for records management (LC6) duty authorised and other suitability qualified and experienced persons (LC12) and control and supervision or operations (LC26)
14-001 32, 34, 35 June 2014 Site Inspection Visit

GE Healthcare Ltd, The Maynard Centre (TMC) Cardiff [Nuclear Site Licence 38B]

IR no LC no(s) Date Title
14-213 2, 7, 11, 13,25, 36 February 2015 GE Healthcare Ltd (GEHC), Cardiff Nuclear Licensed Site (CNLS) Readiness inspection for de-/re-licensing
14-166 10, 12, 23, 24, 27, 28, 34  November 2014 GE Healthcare Ltd (GEHC), Cardiff Nuclear Licensed Site (CNLS) System inspection of drum inspection X-ray facility

Hartlepool [Nuclear Site Licence 59]

IR no LC no(s) Date Title
14-243 15 March 2015 Licence Condition Compliance Inspections covering LC15
14-232 10, 23, 24, 27, 28, 34 March 2015 Hartlepool planned intervention
14-228 10, 23, 24, 26, 27, 28, 34, 108, 181 February 2015 Hartlepool planned inspection [14-228]
14-222 4, 32, 34 February 2015 Planned Compliance Inspection [14-222]
14-208 11, 12 January 2015 Hartlepool planned inspection - Level 1 exercise
14-201 10, 23, 24, 27, 28, 34 January 2015 Hartlepool planned inspection [14-201]
14-192 10, 23, 24, 27, 28, 34 December 2014 Hartlepool Intervention Plan [14-192]
14-173 23, 28 October 2014 Hartlepool Intervention Plan [14-173]
14-158 12, 22, 27, 28 October 2014 Reactor 1 (R1) 2014 Statutory Outage: Control and Instrumentation (C&I) Inspection
14-157 22, 28, 36 September 2014 Hartlepool Planned Intervention [14-157]
14-155 28 September 2014 Hartlepool Power Station - Reactor 1 Outage 2014 - Civil Engineering Inspection
14-153 N/A September 2014 Hartlepool Power Station - Structural Integrity Compliance Inspection of Licence Condition 28 during Reactor 1 2014 Periodic Shutdown
14-150 N/A September 2014 Statutory Outage - Ionising Radiations Regulations 1999 - Compliance Inspection
14-148 22, 28 September 2014 Unit 1 Periodic Shutdown - Inspection of Electrical Related Aspects
14-135 28 August 2014 Mechanical Engineering Inspection of maintenance conducted during Hartlepool Unit 1 2014 periodic shutdown
14-132 11, 28 August 2014 Hartlepool - Planned intervention
14-129 28 September 2014 Intervention to inspect the structural integrity aspects of the Reactor 1 graphite core inspection programme
14-127 10, 23, 24, 27, 28, 34 August 2014 Planned Systems Inspection of the Gaseous and Solid Radioactive Waste Management Systems
14-114 28 July 2014 Hartlepool intervention plan [14-114]
14-100 7, 10, 23, 24, 27, 28, 34 July 2014 Hartlepool intervention plan [14-100]
14-006 10, 11, 22, 23, 24, 27, 28, 34, 108 May 2014 System Based Inspection, SB104, Auxiliary Cooling (Including Pressure Vessel Cooling Water System)
14-005 7, 30 June 2014 Hartlepool Intervention Plan [14-005]
14-004 28, 30 May 2014 Hartlepool Power Station - Meeting to Discuss APEX work on Reactor 1 Outage 2014
14-003 7, 26 May 2014 Reactive Inspection of Event Investigation and Learning from Events Following a Number of Fire Events
14-001 32 March 2014 Planned Site Inspection

Harwell [Nuclear Site Licence 99]

IR no LC no(s) Date Title
14-217 13, 17 February 2015 Harwell Planned Intervention
14-189 2 January 2015 Research Sites Restoration Ltd (RSRL) – Harwell – Planned Intervention
14-186 34 December 2014 Harwell site – Research Sites Restoration Ltd (RSRL) – Harwell – Planned Intervention
14-154 23, 24, 28, 35, 106 October 2014 Mechanical Inspector – 2.1 V Green – Harwell nominated site inspector
14-130 100 September 2014 RSRL Harwell to inspect control of occupational radiation exposure to asess compliance with Regulation 8 of the IRR99
14-111 7, 10, 11, July 2014 Harwell Site Inspection
14-001 17, 21, 22 April 2014 Planned intervention at Research Restoration Sites Ltd's Harwell licensed site, undertaken as part of a series of planned interventions outlined in the ONR Plan for the Regulation of the Harwell and Winfrith Sites 2014/2015

Heysham 1 [Nuclear Site Licence 60]

IR no LC no(s) Date Title
14-242 28 March 2015 Inspection of Crack on Reactors 1 and 2 DC Heater 2 Support Structure
14-231 28 March 2015 Heysham 1 R2 Pre-Outage visit
14-223 10, 23, 24, 27, 28 February 2015 Heysham 1 Planned Inspection - SB127 Reactor Safety System Trip Parameters
14-206 28 February 2015 Mechanical Engineering Outage Inspection of LC28 examination, inspection, maintenance and testing
14-199 22 January 2015 Heysham 1 Planned Intervention
14-189 36 December 2014 LC36 Compliance Inspection, Annual Review of Safety and ONR Board Visit
14-186 10, 23, 24, 34, 28, 27, 102 December 2014 System Based Inspection of the Additional Fuel Storage Facility (AFSF) - Review of ONR Issues
14-175 11 November 2014 Level 1 Demonstration Exercise "CURRIE"
14-171 22, 103, 108 October 2014 Operational readiness Inspection for Reactor 2 Return to Service Under the Boiler Spine Safety Case
14-152 25, 106, 108 September 2014 Heysham 1- Planned intervention
14-137 10, 23, 24, 27, 28, 34, 108 August 2014 Planned Systems Inspection of the Gaseous and Solid Radioactive Waste Management Systems + Meeting with EDF Energy Nuclear Generation Ltd Internal Regulator
14-116 7 July 2014 LC7 - Incidents on Site: Meeting with Licensee Internal Regulators
14-110 N/A July 2014 Vessel Entry Complex Inspection (for compliance with the Ionising Radiations Regulations 1999)
14-109 22 June 2014 Heysham 1 Reactor 1 Boiler Spine 1D1 Level 4: In-vessel Inspection Readiness
14-007 10, 23, 24, 27, 28, 34 June 2014 System Based Inspection
14-006 10, 23, 24, 27, 28 May 2014 System Based Inspection, SBI 04 - Auxiliary Cooling (including Pressure Vessel Cooling Water System)
14-005 22 May 2014 Emergency Exercise Review Meeting, Review of ONR Issues, Level 4 Hazards Meeting, LC22 - Modification or Experiment on Existing Plant, Local Community Liaison Committee
14-004 N/A May 2014 Heysham 1 Level 4 Hazards meeting and plant inspection (one of a series of interventions) to monitor the progress at the hazards safety cases
14-003 10,23,24,27,28, 34 April 2014 LC28 Examination, Maintenance, Inspection & Testing
14-001 32, 34 April 2014 Planned Intervention to Undertake a LC32 Inspection with a Focus on ILW Filters and the Solid Radioactive Waste Management Facilities

Heysham 2 [Nuclear Site Licence 60]

IR no LC no(s) Date Title
14-244 28 March 2015 Reactor 7 Periodic Shutdown Inspection of Electrical Related Aspects
14-241 17, 22 March 2015 Heysham 2 Power Station – Reactor 7 Outage Compliance Inspection of LC17 and LC22 and R7 Mid Outage Review Meeting
14-239 18 March 2015 Reactor Unit 7 Statutory Outage 2015
14-235 28 March 2015 Heysham 2 Reactor 7 2015 Periodic Shutdown: Graphite Core Inspection
14-224 28 March 2015 Structural Integrity Compliance Inspection of Licence Condition 28 during Reactor 7 2015 Periodic Shutdown
14-215 23, 24 February 2015 LC23 (Operating Rules) and LC24 (Operating Instructions) Compliance Inspection
14-207 11 February 2015 Level 1 Demonstration Exercise “Corolla” and Emergency Arrangements Interim Meeting
14-196 36 January 2015 Heysham 2 LC36 Compliance Inspection, LC32/34 Meeting, and INA Discussions
14-187 10, 22, 23, 24, 26, 27, 28 December 2014 Heysham 2 Power Station - Licence Condition 22 and 26, and SBI-23 “CO2 Processing and Blowdown” Compliance Inspection
14-172 32, 34 November 2014 LC32 and LC34 Compliance inspection
14-166 6, 10, 23, 24, 27, 28, 102, 158 October 2014 Licence Condition 6, ONR Issues Database Meeting, and SBI-11 “Fire Detection, Suppression, Barriers, Doors and Dampers” Compliance Inspection
14-138 7, 11, 13 September 2014 Exercise Annual Review Meeting, Emergency Planning and Consult Committee
14-120 10, 23, 24, 27, 28, 34 August 2014 Heysham 2 - Planned intervention
14-113 102 July 2014 Heysham 2 Power Station Quarterly ONR Issues Database Discussion
14-107 10, 12, 36 July 2014 Heysham 2 Power Station Licence Condition Compliance Inspection
14-102 107 July 2014 Heysham 2 Power Station Annual Review of Safety
14-005 N/A June 2014 Level 4 meeting on Heysham 2/Torness post-stress reversal, pre keyway root cracking graphite safety case NP/SC 7663
14-004 10, 23, 24, 27, 28 June 2014 System Inspection (SBI-09 Main Electrical System)
14-003 22, 28, 29 May 2014 Heysham 2 Power Station - LC22, LC28 Licence Condition compliance inspection
14-002 N/A April 2014 Heysham 2 Power Station- ONR Issues Database Meeting
14-001 N/A April 2014 System Based Inspection [14-001]

Hinkley Point A [Nuclear Site Licence 95]

IR no LC no(s) Date Title
14-229 12, 22, 26, 28 (3 and 11 for info) March 2015 Hinkley Point A – Licence Condition 12, 22, 26 and 28 Compliance Inspection, Contamination Control Exercise and progress meetings
14-192 7, 10, 23, 24, 27, 28, 34, 35 January 2015 Hinkley Point A - Fire Protection System Based Inspection, Project Progress and Safety Representative meetings
14-168 24, 32, 33, 34, 35 November 2014 Joint compliance inspection with the Environment Agency covering licence conditions 24, 32, 33, 34 and 35
14-148 7, 11, 36 September 2014 LC7, 11 and 36 Compliance Inspections; Progress and Safety Representatives Meetings
14-118 N/A July 2014 System based Inspection on Emergency Arrangements; Meeting with Safety Reps; Issues and Project Progress
14-003 2, 8, 9, 16 May 2014 Compliance with Licence Conditions 2, 8, 9 and 16 Inspection together with Projects and Safety Representative meetings

Hinkley Point B [Nuclear Site Licence 62C]

IR no LC no(s) Date Title
14-240 28 March 2015 2015 Reactor Periodic Shutdown – Inspection of examination, maintenance and testing in support of steel structural integrity
14-238 22, 27, 28 March 2015 Statutory Outage – Control and Instrument (C&I) Inspection at Hinkley Point B
14-233 7, 30, 36 March 2015 Planned intervention [14-233]
14-230 22 March 2015 Readiness inspection of the new nitrogen storage and distribution system as part of the planned permissioning activity for the diverse hold-down project
14-225 32 March 2015 Planned compliance inspection [14-225]
14-221 28 February 2015 Hinkley Point 'B' Power Station - Reactor 4 Periodic Shutdown - Inspection of Electrical Related Aspects
14-217 17 February 2015 To inspect the Outage Quality Management Arrangements being applied by HPB to the R4 Statutory Outage and the Quality Assurance arrangements in place for project management of Investment Delivery Projects
14-216 N/A February 2015 Radiological Protection Inspection – Reactor 4 Statutory Outage at Hinkley Point 'B'
14-211 28 February 2015 Reactor 4 Outage – Inspection of Graphite Integrity Aspects at Hinkley Point 'B'
14-205 10, 12 February 2015 Hinkley Point B Planned Intervention
14-204 105, 108 February 2015 Hinkley Point B planned intervention [14-204]
14-197 22, 26 January 2015 Hinkley Point B Planned intervention [14-197]
14-188 11, 102, 108 November 2014 Hinkley Point B Planned Intervention [14-188]
14-179 22, 28 November 2014 Hinkley Point B planned intervention [14-179]
14-178 28 November 2014 Mechanical engineering pre-outage inspection of LC28 examination, inspection, maintenance and testing
14-164 26, 103, 108 October 2014 Hinkley Point B planned Intervention [14-164]
14-161 34 October 2014 Inspection of the Implementation of New Corporate Programme for Improved LC34 Compliance
14-156 28 September 2014 Mechanical Inspection of Reactor 4 period shutdown
14-146 N/A September 2014 EDF Energy - Nuclear Generation Ltd - Hinkley Point B Planned Intervention
14-134 10, 23, 24, 27, 28, 34, 36 September 2014 Hinkley Point B - Planned Intervention [14-134]
14-118 30, 32, 34 August 2014 Hinkley Point 'B' Power Station - Planned Inspections
14-004 (SBI) 10, 23, 24, 27, 28, 158; 11, 30 June 2014 Hinkley Point B Planned Intervention [14-004]
14-003 10, 15, 23, 24, 25, 27, 28, 34 June 2014 Hinkley Point B - Planned Intervention
14-002 7, 8 May 2014 Planned inspection of Hinkley Point B
14-001 N/A April 2014 Inspection of the Fuel Route

Hinkley Point C

IR no LC no(s) Date Title
14-109 N/A August 2014 Balance of Nuclear Island (BNI) Safety Functional Requirements Note (SFRN) Cross-Cutting Intervention
14-103 N/A July 2014 HPC Site Inspection
14-034 N/A June 2014 Level 4 External Hazards meeting
14-033 N/A June 2014 Level 4 Fuel, Core and Criticality Meeting
14-032 N/A May 2014 Level 4 LC21 Commissioning meeting
14-025 N/A May 2014 Level 4 Organisational Learning meeting
14-023 N/A May 2014 Level 4 Cross Cutting Intervention Training and Communications meeting
14-020 N/A April 2014 Internal Hazards Information Gathering
14-019 N/A May 2014 Civil Engineering Interim Arrangements for Design Change
14-016 N/A May 2014 Level 4 meeting to discuss the development of NNB GenCo's Quality Management Arrangements
14-015 N/A May 2014 Level 4 Documents and Records Meeting
14-013 N/A April 2014 Structural Integrity Level 4 Meeting
14-012 N/A April 2014 Level 4 intervention to assess the continuing adequacy of NNB GenCo's organisational capability
14-010 N/A May 2014 Level 4 Supply Chain Meeting
14-006 N/A April 2014 Civil Engineering Meeting

Hunterston A [Nuclear Site Licence 16]

IR no LC no(s) Date Title
14-218 20, 36 March 2015 Site inspection of Hunterston A [14-218]
14-197 10, 23, 24, 28, 34 January 2015 Site inspection of Hunterston A [14-197]
14-190 7 January 2015 Assessment of Quality Investigations and Operational Experience Feedback Processes
14-167 7, 11, 22 November 2014 Site inspection of Hunterston A [14-167]
14-132 11, 23, 24 September 2014 Site inspection of Hunterston A [14-132]
14-115 2, 8 August 2014 Site inspection - Hunterston A
14-001 11, 23, 24 May 2014 Site inspection of Hunterston A [14-001]

Hunterston B [Nuclear Site Licence 13]

IR no LC no(s) Date Title
14-245 7, 10, 23, 24, 27, 28 March 2015 Hunterston B planned intervention [14-245]
14-226 11 February 2015 Hunterston B planned intervention [14-226]
14-212 12, 26 February 2015 Hunterston B planned intervention [14-212]
14-202 9, 10, 23, 24, 27, 28, 34, 35, 102, 108 January 2015 Hunterston B Planned Intervention [14-202]
14-191 15, 36 December 2014 Hunterston B Planned Intervention [14-191]
14-183 10, 23, 24, 27, 28, 34 November 2014 Hunterston B Planned Intervention [14-183]
14-182 22 November 2014 Readiness inspection of the new nitrogen storage and distribution system as part of the planned permissioning activity for the diverse hold-down project [14-182]
14-176 22 November 2014 Readiness Inspection for Trial Movement of Unbottled Failed Fuel from HNB to Sellafield (Alternative Failed Fuel Disposal - AFFD Project)
14-167 4, 27, 108 October 2014 EDF Energy – Nuclear Generation Ltd – Hunterston B Planned Intervention
14-159 1 October 2014 Hunterston B planned inspection
14-149 28 September 2014 Mechanical Inspection of Reactor 4 Periodic Shutdown
14-143 7, 22 September 2014 Planned Intervention - Hunterston B
14-142 N/A September 2014 EDF Energy - Nuclear Generation Ltd - Hunterston B - Planned Intervention
14-141 28 September 2014 Reactor 4 (R4) Control and Instrumentation (C&I) Statutory Outage Inspection
14-139 28 September 2014 Periodic Shutdown Inspection of Electrical Related Aspects
14-133 32 August 2014 Planned intervention - Hunterston B [14-133]
14-131 17, 26 August 2014 Site Inspection to support Reactor Outage Intervention Strategy, focussing on LC17 and incorporating LC26
14-130 N/A September 2014 Hunterston 'B' Power Station - Vessel Entry Complex Inspection
14-128 28 September 2014 Hunterston B Reactor 4 2014 periodic shutdown- inspection of the structural integrity aspects of the steels inspection programme
14-126 28 August 2014 Reactor 4 during 2014 statutory outage - graphite related activities
14-125 22, 28 September 2014 Mechanical Inspection of Hunterston B R4 2014 Statutory Outage
14-123 7 August 2014 Hunterston B - Planned Intervention [14-123]
14-108 30 July 2014 Hunterston B - Planned Intervention [14-108]
14-105 SBI 22 (10, 23, 24, 27, 28, 158), 106, 108 July 2014 Hunterston B - Planned Intervention [14-105]
14-005 N/A June 2014 Meeting to Discuss the Inspection and Maintenance Conducted by the Appointed Examiner (APEX) on Reactor 4 During Its 2014 Periodic Shutdown
14-004 9, 10, 18, 22, 23, 28, 34 June 2014 Hunterston B Licence Condition (LC) compliance inspections
14-003 10, 23, 24, 27, 28, 34 May 2014 System Based Inspection [14-003]
14-002 23, 36 April 2014 Planned Inspection of Hunterston B
14-001 11 April 2014 Planned Inspection of Hunterston

Imperial College [Nuclear Site Licence 7B]

IR no LC no(s) Date Title
14-214 2 February 2015 Inspection of Arrangements and their Implementation for Compliance with LC13 Nuclear Safety Committee
14-128 35, 36 October 2014 LC35 (Decommissioning) & LC36 (Organisational capability) inspection
14-104 N/A June 2014 Systems Intervention Conducted at Imperial College Reactor Centre
14-103 21 June 2014 LC21 Commissioning Inspection of Defuelling process
14-002 9, 10, 12, 21, 26, 36 May 2014 Imperial College Reactor Centre (ICRC) - ICOL LC 21 Active Commissioning Readiness Inspection
14-001 11 April 2014 Imperial College Reactor Centre (ICRC), Silwood Park, Ascot - Part 1 Defuelling preparations progress update Part 2 Follow-up tabletop emergency exercise

Low Level Waste Repository (LLWR) [Nuclear Site Licence 82]

IR no LC no(s) Date Title
14-176 10, 12 November 2014 Planned Operations with LLWR relating to LLWR Site Operations
14-146 24 September 2014 Planned interventions with LLWR relating to LLWR site operations undertaken as part of the planned ONR programme covered by the ONR LLWR inspection plan for 2014/15
14-001 14, 15 May 2014 Low Level Waste Repository (LLWR) Site Inspection Visit

Oldbury [Nuclear Site Licence 57A]

IR no LC no(s) Date Title
14-221 3, 32, 34 March 2015 Oldbury Nuclear Licensed Site Planned Inspection against Licence Conditions 3, 32 and 34 on Operational Records and Control and Supervision of Operations
14-211 28, 35, 36 February 2015 Site Inspection against Licence Conditions 28, 35 and 36 on Operational Records and Control and Supervision of Operations
14-194 25, 26 January 2015 Planned Site Inspection against Licence Conditions 25 and 26 on Operational Records and Supervision of Operations
14-182 11 December 2014 Oldbury nuclear licensed site emergency exercise inspection
14-163 22, 23, 24 November 2014 Oldbury visit
14-158 10, 12, 23, 24, 27, 28, 34   October 2014 Oldbury nuclear licensed site planned inspections and meetings
14-120 11, 103 July 2014 Inspection and meeting
14-104 11, 34 July 2014 Oldbury annual review of safety meeting and inspection
14-003 34 June 2014 Oldbury Inspection of Fuel Route after Contamination found at Sellafield
14-002 11, 17 May 2014 Oldbury Site Inspection
14-001 10, 23, 24, 27, 28, 34 April 2014 Oldbury - System Inspection Of The Cooling Water System

Sellafield [Nuclear Site Licence 31G]

IR no LC no(s) Date Title
14-160 32, 35 March 2015 Plutonium Management Facility South (PMF-S) - Sellafield MOX Plant (SMP)
14-159 N/A March 2015 Pile Fuel Storage Pond (PFSP) Drum Filling Plant (DFP) Inactive Safety Commissioning Readiness Inspection at the Nuvia Works Test Facility
14-158 28, 32 March 2015 SIXEP LC28 & LC32 Inspections and Routine Interactions
14-157 10, 23, 24, 27, 28, 34 March 2015 Analytical Services nuclear ventilation system
14-156 10, 23, 24, 27, 28, 34 February 2015 Sellafield WEP Feed Stream Interlocks SBI
14-155 N/A March 2015 Essential Operations Inspection of the Site Communications Systems
14-154 11 February 2015 LC11 compliance inspection of WVP
14-153 10, 23, 24, 27, 26, 27, 28, 34 February 2015 Inspection of Sellafield’s Arrangements for Compliance with LC 26 Control and Supervision of Operations
14-152 10, 23, 24, 27, 28, 32, 34 February 2015 Analytical services re LCs 32 and 34
14-151 10, 23, 24, 27, 28, 34 February 2015 To conduct a system inspection and undertake routine regulatory interactions with Sellafield Limited
14-150 2, 10, 23, 24, 27, 28, 34 February 2015 LC 2 compliance arrangements inspection (Sellafield and Calder)
14-149 15 February 2015 LTPR Inspection of Pile Fuel Cladding Silo
14-148 10, 23, 24, 27, 28, 34, 34 February 2015 THROP cooling Water Systems Based Inspection and LC34 Compliance Inspection
14-147 23, 28, 34 February 2015 Sellafield Inspection RST and EDT Settling Tanks
14-146 32 January 2015 LC32 Inspection – Waste Treatment Complex (WTC)
14-145 12, 26 January 2015 To conduct LC12 and LC 26 compliance inspections at Sellafield Limited
14-144 10, 36 January 2015 To undertake a Licence Condition10 Inspection of the Fuel Handling Plant and a Licence Condition 36 Inspection of Calder Hall
14-143 N/A January 2015 To conduct an IRR99 compliance inspection of contamination events control at Fuel Handling Plant
14-142 27, 28 January 2015 LC27, 28 inspection
14-140 7 January 2015 LC 7 Inspection – Waste Vitrification Plant (WVP)
14-139 22, 28 January 2015 LC22, 28 Inspection – Product Management Facilities North (PMF N)
14-138 N/A January 2015 Sellafield - Evaporator D Programme Inspection
14-137 27, 28, 34 January 2015 LC27, LC28 and LC34 Compliance Inspections  - Fuel Handling Plant
14-136 5 December 2014 Licence Condition 26 Inspection of Pile Fuel Storage Pond Operations
14-135 22 December 2014 LC22 Inspection of Modifications in SR&DP Demolitions team
14-134 10, 12 December 2014 Licence Condition 10 & 12 inspection of training and capability in Decommissioning Division
14-133 10, 22, 23, 24, 27, 28, 34 December 2014 Planned system based inspection of the Product Purification (PP) cycle reagent and chemical safety system
14-132 11, 25, 35 December 2014 To conduct LC11, LC25 and LC35 compliance inspections and undertake routine regulatory interactions with Sellafield Limited
14-131 10, 23, 24, 27, 28, 34 December 2014 Planned system based inspection of the Product Purification (PP) cycle reagent and chemical safety system [14-131]
14-130 28 November 2014 Inactive Tank Farm (ITF) - LC28 Compliance Inspection
14-129 22 November 2014 LC 22 Inspection - Waste Vitrification Plant (WVP)
14-128 17 November 2014 Sellafield Inspection of Design Arrangements in Decommissioning
14-127 10, 23, 24, 27, 28, 32, 34 November 2014 To conduct a system inspection, a LC32 compliance inspection and undertake routine regulatory interactions with Sellafield Limited
14-126 35 October 2014 PFCS Tactical Plan Inspection
14-125 10, 21, 24, 26, 27, 34 October 2014 Sellafield - EPS3 Consent To Operate Readiness Inspection
14-124 22 October 2014 LC22 Benchmark Inspection, Risley
14-123 701 October 2014 Waste Vitrification Plant Line 3 Improvement Notice Close-Out Inspection
14-122 10, 12, 21, 26 October 2014 Sludge Packing Plant 1 (SPP1) Readiness Inspection – 21 October 2014, Sellafield - Additional Sludge Retrievals (ASR) Readiness Inspection – 22 Oct 2014, Integrated Test Facility, Forth Engineering, Maryport
14-121 10, 23, 24, 27, 28, 34 October 2014 Sellafield Licence Condition 32 Inspection in the Decommissioning Division
14-120 10, 23, 24, 27, 28, 34 October 2014 WVP HAL Cooling - System Based Inspection (SBI)
14-119 11 September 2014 Sellafield Ltd and Calder Works – LC11 Benchmark Inspection
14-118 10, 23, 24, 27, 28, 34 September 2014 WEP Gamma Monitoring and Structural Containment Systems Inspection
14-117 N/A September 2014 Waste Vitrification Plant Line 3 Improvement Notice Close-Out Inspection [14-117]
14-116 26 September 2014 WVP Line 3 Readiness Review - LC26 compliance inspection
14-115 10, 23, 24, 27, 28, 34 September 2014 Sellafield Inspection of FGMSP Pond Liquor Controls
14-114 10, 23, 24, 27, 28, 34 September 2014 Electrical Systems Based Inspection at THORP
14-113 10, 23, 24, 27, 28, 34 September 2014 B205 System Inspection 'Steam' and Routine Interactions
14-112 15 September 2014 Sellafield: B268 LTPR inspection
14-111 11 August 2014 LC11 Compliance Inspection THORP
14-110 10 August 2014 Package Management & Railways (PM&R) - Compliance Inspection - LC10 (Training)
14-109 35 August 2014 Sellafield - LC35 inspection in Decommissioning Division
14-108 7 August 2014 Sellafield - LC7 inspection in Decommissioning Division
14-107 10, 22 July 2014 Inspection of human factors aspects of Residues Transfer Project
14-106 10, 24, 27, 28, 34 July 2014 To conduct a planned systems inspection of the B560 containment system
14-105 15 August 2014 Sellafield: B13 LTPR inspection
14-104 10, 24, 27, 28, 34 July 2014 Sellafield PMF(S) FL6 Control System Systems Inspection
14-103 10, 23, 24, 27, 28, 34 July 2014 To conduct a system inspection, attend a Level 4 meeting and undertake routine regulatory interactions with Sellafield Limited
14-102 10, 23, 24, 27, 28, 34 August 2014 HALES C5 Vessel Ventilation - System Based Inspection (SBI)
14-101 13 July 2014 Sellafield Site Benchmark Inspection of LC13: Nuclear Safety Committee arrangements
14-100 36 July 2014 Sellafield - Planned Licence Condition Inspection of Thorp and Early Engagement on Decommissioning Projects
14-023 10, 23, 24, 27, 28, 34 July 2014 Sellafield Inspection of MSSS Silo Liquor Controls
14-022 11 July 2014 Sellafield - Level 1 Emergency Exercise "Exercise Starling" LC11 Assessment
14-021 10, 23, 24, 27, 28, 34 June 2014 Sellafield PMF(N) Ventilation Systems Inspection
14-020 11 June 2014 Sellafield - LC11 Inspection Emergency Arrangements in SR&DP
14-019 28 June 2014 Sellafield - First Generation Reprocessing Plants - Civil Asset Care Inspection
14-018 10, 23, 24, 27, 28, 34 June 2014 Sellafield - High Level Waste Plant - Waste Vitrification Plant - Lines 1 and 2 - Containment System
14-017 10, 12, 32 June 2014 THORP LC 10 12 & 32 Routine Compliance Inspection and Information Sharing
14-016 26, 27, 28 June 2014 Solid Waste LC 26 27 & 28 Routine Compliance Inspection 04
14-015 10, 23, 24, 27, 28, 34 June 2014 MSSS Crane System Inspection
14-014 23, 24 April 2014 Sellafield PMF LC23 and 24 Compliance Inspection
14-013 23, 24 May 2014 Solid Waste WTC1 Licence Conditions 23 and 24 Compliance
14-012 23, 24, 26 May 2014 Sellafield - THORP - TOS (Thorp Operational Services) - Routine licence compliance inspection covering Licence Conditions 23, 24 and 26
14-011 22, 24, 26, 27, 28, 36 May 2014 Sellafield - Magnox Reprocessing Plant - To Conduct Licence Condition Compliance Inspections
14-010 17 April 2014 Sellafield - LC17 Inspection of Management Systems and Assurance in Decommissioning
14-009 2, 36 April 2014 Sellafield - IWM Inspection in SR&DP [14-009]
14-008 12, 27, 36 April 2014 LC12, LC27 and LC36 inspections
14-007 100 April 2014 Control of Radiation Exposure
14-005 7 April 2014 LC 07 Inspection THORP
14-001 7 April 2014 LC7 Inspection

Sizewell A [Nuclear Site Licence 96]

IR no LC no(s) Date Title
14-223 32, 33, 34, 35 March 2015 Sizewell A Licence condition 32, 33, 34 and 35 compliance inspections
14-201 10, 23, 24, 28, 34 February 2015 Planned System Inspection
14-196 17 December 2014 Sizewell A Fuel free verification inspection Annual review of Safety
14-164 7, 10, 23, 24, 28 November 2014 LC7 and LC11 Compliance Inspections, Emergency Arrangements Equipment Systems Inspection
14-137 10, 12, 26 August 2014 Licence condition 10, 12 and 26 compliance inspection
14-129 11, 23 August 2014 Planned site inspection [14-129]
14-002 2, 8, 9 June 2014 Sizewell A Planned Compliance Inspection
14-001 N/A April 2014 Transition inspection

Sizewell B [Nuclear Site Licence 63]

IR no LC no(s) Date Title
14-220 11 February 2015 Sizewell B Power Station - Level 1 Emergency Exercise Tiger - Level 4 meetings RO13 report and IAEA OSART Mission
14-214 19, 21 February 2015 Dry fuel storage inspection
14-198 30 October 2014 Sizewell B Power Station RO13 Compliance Inspection - Licence Condition 30 – Periodic Shutdown
14-190 10, 12, 23, 24, 27, 28 January 2015 System Based Inspection – SBI 22 – Essential Electrical System
14-172 17 October 2014 Site Inspection to support Reactor Outage Intervention Strategy focussing on LC17
14-170 22, 27, 28 October 2014 Inspection of C&I Equipment at Sizewell B Nuclear Power Station to Determine Continued Suitability to Control Risks
14-169 28 October 2014 Inspection of structural integrity aspects of the 2014 periodic shut down (RO13)
14-163 26 October 2014 Sizewell B Refuelling Outage (RO) 13 - Second Outage Visit, Mechanical Inspection and LC 26 inspection
14-162 22, 28 October 2014 Mid Outage Inspection
14-140 19, 21 September 2014 Licence Conditions Compliance Inspections against LC19 and 21 in support of Permissioning of the Dry Fuel Store Project
14-136 10, 23, 24, 27, 28, 34, 103 September 2014 EDF Energy Nuclear Generation Limited (NGL) Sizewell B - Planned Intervention
14-124 10, 23, 24, 27, 28, 34 August 2014 System Based Inspection 05 - Auxiliary Systems: Containment Access (KL) and Local Leak Rate Test System(GP)
14-106 N/A July 2014 PSR2 Safety Management
14-103 N/A July 2014 PSR2 External & Internal Hazards
14-101 10, 23, 24, 27, 28, 24 July 2014 System based Inspection SBI-12, Emergency Core Cooling Systems (ECCS) EM & BN
14-004 N/A June 2014 Level 4 Meeting PSR2 External Hazards
14-003 N/A April 2014 System Based Inspection, SBI-10 - Fuel Pond Cooling and Clean-Up Systems
14-002 N/A May 2014 Level 4 Meeting with EdF Nuclear Generation Ltd (NGL) on a range of Sizewell B (SZB) fuel topics

Springfields [Nuclear site licence 79]

IR no LC no(s) Date Title
14-226 7, 14, 36, IRR99 (100) March 2015 Springfields Fuels Limited reactive intervention
14-208 35 February 2015 Intervention to Discuss the remaining lifetime of the Legacy Uranic Residue Processing Facilities [14-208]
14-199 32, 35, 101 January 2015 Planned system intervention, inspecting the implementation of the safety case at the Enriched Uranic Residue Processing Plant, together with participation in the quarterly regulatory review meeting, as part of the 2014/20145 Intervention Programme
14-198 22, 23 January 2015 Reactive Interventions to discuss future Uranic Materials Processing Projects
14-187 N/A December 2014 Planned and Reactive Interventions as part of the 2014/2015 Intervention Programme
14-172 N/A November 2014 Site Stakeholder Group Meeting
14-145 N/A March 2015 Springfields fire Intervention Record
14-145 33, 35, 101 October 2014 Intervention at Springfields Fuels Limited
14-142 101, 105 September 2014 Planned participation in the Springfields Emergency Planning Consultative Committee, (EPCC) meeting at Lancashire Constabulary HQ, Hutton
14-138 3, 7, 12, 36, 104 September 2014 Intervention, inspections and discussion at Springfields Fuels Limited
14-134 10, 14, 23, 24, 27, 28, 34 September 2014 Planned Systems Intervention to inspect the implementation of the nuclear safety case at the National Nuclear Laboratory Limited tenant facility
14-116 7, 33 August 2014 Reactive Intervention at Springfields, Inspection of arrangements for the disposal of solid radioactive waste
14-112 26, 35 July 2014 Spring fields Fuels Limited- Intervention to inspect the implementation of arrangements for the control and supervision of contractors
14-103 36 July 2014 Springfields Site Inspection
14-003 11 May 2014 Planned observation of a demonstration of the 'on site' licence condition 11 emergency arrangements
14-002 36 May 2014 Two reactive site inspections, responding to the Licensee's announcement of the early cessation of production from the Uranium Hexafluoride Plant, now proposed for Aug 2014, rather than 2016
14-001 7, 11 April 2014 Reactive site inspection following a recent minor event and a meeting to discuss a forthcoming observed exercise

Studsvik [Nuclear site licence 91]

IR no LC no(s) Date Title
14-139 24 September 2014 Planned interventions with MRF relating to MRF site operations undertaken as part of the planned ONR programme covered by the ONR MRF inspection plan for 2014/15 [14-139]
14-109 32 July 2014 Planned interventions with MRF relating to MRF site operations undertaken as part of the planned ONR programme covered by the ONR MRF inspection plan for 2014/15

Torness [Nuclear Site Licence 14]

IR no LC no(s) Date Title
14-234 10, 23, 24, 27, 28, 34 March 2015 System Based Inspection – SBI03 (Boiler Feed Systems)
14-213 10, 32, 34, 36 February 2015 Torness Power Station - Licence Condition Compliance Inspection covering LC10, 32, 34 and 36
14-194 4, 22 December 2014 LC4 & LC22 Licence Compliance Inspection
14-177 10, 11, 23, 24, 28 November 2014 System Based Inspection – SBI10 (Emergency Equipment) and LC11 Compliance Inspection
14-168 7, 12, 15 October 2014 Licence Condition Compliance Inspections covering LC7, LC12 and LC15
14-144 10, 23, 24, 27, 28, 34 September 2014 EDF Energy Nuclear Generation Limited (NGL) Torness - Planned Intervention - SBI19 (H&V Systems)
14-122 9, 22, 26 August 2014 Torness Power Station - Licence Condition Compliance Inspections covering LC9, LC22 and LC26
14-005 10, 23, 24, 27, 28, 34 July 2014 System Based Inspection - SBI 09 - Main Electrical System
14-004 23, 24 June 2014 Torness Power Station - Annual Review of Safety and Licence Condition Compliance Inspections covering LC23 and LC 24
14-003 23 June 2014 Inspection of post-implementation of the Essential Systems Outage Program (ESOP) Torness
14-002 10, 23, 24, 27, 28, 34 May 2014 Systems Based Inspection (Fuel Assemblies)
14-001 11, 28, 36 April 2014 LC11 Level 1 Demonstration Exercise "Glasgow" and Licence Condition Compliance Inspection covering LC28 and LC 36

Trawsfynydd [Nuclear Site Licence 81]

IR no LC no(s) Date Title
14-222 10, 24, 28 March 2015 Trawsfynydd Decommissioning Installation – 2014/15 IIS Plan - Systems based inspection; S5.1 EP&R Equipment
14-179 22, 23, 24, 28 December 2014 LC 22, 23, 24 and 28 compliance inspections
14-150 12, 26, 36 October 2014 LC12, 26 and 36 Compliance Inspection
14-149 32, 33, 34 November 2014 Compliance Inspection LC 32, 33 and 34
14-113 10, 23, 24, 27, 28, 34 July 2014 System inspection
14-003 7, 8, 9, 11 June 2014 Trawsfynydd Compliance Inspection Level 1 exercise
14-003 2 June 2014 SSG and an LC 2 inspection
14-002 35 April 2014 Planned compliance inspection (LC35) [Cymraeg]

Urenco [Nuclear Site Licence 48E]

IR no LC no(s) Date Title
14-234 7 March 2015 Meeting with Licensees Safety Representatives and Meeting to Discuss recent incident on the Tails Management Facility
14-230 10, 23, 24, 27, 28, 34 March 2015 Systems Based Inspection (SBI) of Materials Containment at UUK Capenhurst
14-228 33, 35, 36 March 2015 Participation in Liaison Meetings between the Urenco UK Limited Licensee
14-227 7 March 2015 Capenhurst Reactive Intervention
14-203 32, 34 February 2015 Joint ONR/EA Land Quality Inspection of East Side Curtilage CNS Capenhurst
14-200 7 January 2015 Familiarisation visit for the Programme Director to Enrichment and Uranic Storage Facilities
14-188 12, 23 December 2014 Planned compliance inspection of the licensee’s licence condition 12 and licence condition 23 arrangements, as part of the 2014/15 inspection plan for Urenco UK Limited
14-180 11, 19, 101 December 2014 Participation in the Tails Management Facility project joint regulator update meeting and a meeting to finalise the detailed arrangements for a forthcoming Level One emergency exercise
14-174 7 November 2014 Planned participation in the Local Liaison Committee meeting as part of the 2014/15 Inspection programme for the Capenhurst Site
14-173 7, 11 November 2014 Compliance intervention, forming part of the 2014/15 inspection programme for the Capenhurst site
14-144 11, 105 October 2014 Planned Compliance Intervention to inspect the implementation of aspects of the licensee's Emergency Arrangements
14-143 7, 33, 101 September 2014 Participation in the quarterly regulatory review meeting between the licensee and the regulators
14-122 32, 34, 35 July 2014 Licence Condition 32, 34 and 25 Inspection, Urenco UK Limited, Capenhurst
14-003 19 June 2014 General site familiarisation and review of Legacy Cylinder Facility PSR
14-002 15 June 2014 Planned inspection at the Urenco UK Limited, Capenhurst licensed site, undertaken as part of a series of interventions outlined in the Fuel Cycle and Waste Site Inspection Plans for 2014/2015
14-001 11, 28, 36 April 2014 UUK Capenhurst - Observation of L2 Exercise Cypress

Winfrith [Nuclear Site Licence 85]

IR no LC no(s) Date Title
14-232 8 March 2015 Inspection of Control of Radiation Exposure CORE and As Low As Reasonably Practicable ALARP
14-207 2 February 2015 Winfrith - Planned Intervention
14-184 36 December 2014 LC 36 Inspection – Parent Body Organisation transition
14-162 27, 103, 106 November 2014 Research Sites Restoration Ltd (RSRL) - Winfrith - Planned Intervention
14-135 2, 7, 26 August 2014 Planned Intervention at RRSL's Winfrith Site
14-001 10, 11, 23, 24, 27, 28, 34 June 2014 Planned intervention at Research Restoration Sites Ltd's Winfrith licensed site, undertaken as part of a series of planned interventions outlined in the ONR Plan for the Regulation of the Harwell and Winfrith Sites 2014/2015

Wylfa [Nuclear Site Licence 58A]

IR no LC no(s) Date Title
14-229 4, 10, 23, 24, 27, 28, 102, 106 March 2015 Planned system-based inspection
14-219 11 February 2015 Planned site intervention
14-218 7, 15, 22 February 2015 Planned Licence Condition Compliance Inspection
14-203 10, 23, 24, 27, 28, 34 January 2015 Planned System Based Inspection at Magnox Ltd.’s Wylfa licensed site, undertaken as part of a series of planned interventions outlined in the ONR Integrated Intervention Strategy Plan Wylfa Power Station 2014/2015
14-193 11, 23, 24 December 2014 Wylfa - Planned intervention [14-193]
14-184 N/A November 2014 Magnox Limited Wylfa - Ionising Radiations Regulations 1999 Compliance Inspection and Personal Contamination Event Investigation
14-180 10, 23, 24, 27, 28, 34, 101, 102, 103, 108 November 2014 Wylfa - Planned Inspection [14-180]
14-165 10, 36 October 2014 Planned Intervention at Magnox Ltd’s Wylfa licensed site, undertaken as part of a series of planned interventions outlined in the ONR Integrated Intervention Strategy Plan Wylfa Power Station 2014/2015
14-147 10, 11, 15, 23, 24, 27, 28, 34 September 2014 Wylfa planned inspection [14-147]
14-121 7, 15, 28, 36 July 2014 Wylfa IIS Inspection
14-112 10, 23, 24, 27, 28, 34 July 2014 Wylfa Power Station
14-006 11, 12, 23, 26, 36 June 2014 Wylfa - Planned IIS Inspections
14-005 N/A May 2014 Wylfa Level 4 - NPSC 4807 Annual Review of the Safety Case for the Integrity of the Reactor 1 Graphite Core 2013 Addendum 10
14-004 12, 27 April 2014 Inspection of the Fuel Route [14-004]
14-003 10, 23, 24, 27, 28, 34 May 2014 Wylfa IIS inspection [14-004]
14-002 22, 30, 32, 34 April 2014 Wylfa Power Station - IIS Inspection