Intervention records - 2018/19

Intervention records are written by our inspectors following visits to the sites we regulate. They are used to record findings and, if appropriate, any significant actions we require the site operator to carry out in order to improve matters.

Publishing executive summaries of these reports is one part of ONR's aim to be open and transparent by helping all of our stakeholders, including the public, understand our work.

Non-site specific

IR no LC no(s) Date Title
18-002 N/A September 2018 Local Authority Inspection – REPPIR (Cumbria County Council)
18-001 N/A July 2018 Hartlepool Borough Council Local Authority Inspection under REPPIR

Aldermaston (AWE) [Nuclear site licence 77]

IR no LC no(s) Date Title
18-112 11 September 2018 AWE - LC11 Compliance Inspection
18-097 10, 23, 24, 27, 28, 34 August 2018 Aldermaston (AWE(A)) Production Facility - System Based Inspection (SBI)
18-088 N/A August 2018 Site inspection to ensure compliance with the Regulatory Reform (Fire Safety) Order 2005
18-076 19, 20 July 2018 Mensa progress meetings and Mensa project compliance inspection of LC 19 and LC 20
18-070 15 June 2018 AWE – Active Labs PRS Inspection  
18-062 N/A June 2018 Management of Legionella Risks & familiarisation visit
18-053 10, 23, 24, 27, 28, 34 June 2018 AWE - Systems based inspection
18-036 N/A April 2018 AWE Aldermaston - Compliance inspection
18-051 22 June 2018 Planned Licence Condition 22 inspection
18-004 27, 28 April 2018 AWE - LC27 and LC28 Inspections  

BAE Systems Marine Limited (Barrow) [Nuclear site licence 42B]

IR no LC no(s) Date Title
18-105 32, 33, 34 August 2018 Barrow – LC32 to LC34 compliance inspections
18-099 36 July 2018 Licence condition compliance inspections - LC 36
18-042 19, 22 May 2018 Barrow – LC19 and LC22 inspection
18-026 7 May 2018 Barrow - LC7 Inspection
18-013 18 May 2018 Barrow - IRR17 Inspection

Berkeley [Nuclear Site Licence 92]

IR no LC no(s) Date Title
18-070 8, 28 July 2018 Compliance inspection of LC8: Warning notices, and LC28 Examination, inspection, maintenance and testing

Bradwell [Nuclear Site Licence 93]

IR no LC no(s) Date Title
18-066 10, 23, 24, 27, 28, 34 July 2018 Bradwell - SBI on preparations for Care and Maintenance operations
18-045 10, 12, 23, 24, 27, 28, 34, 36 June 2018 Bradwell and Sizewell A - SBI on Preparations for Care and Maintenance Operations
18-042 N/A June 2018 Bradwell - Arrangements for managing asbestos containing materials (ACMs) in care and maintenance
18-018 10, 23, 24, 27, 28 April 2018 Bradwell and Sizewell A - SBI on Preparations for Care and Maintenance Operations

Burghfield (AWE) [Nuclear Site Licence 78A]

IR no LC no(s) Date Title
18-102 24 September 2018 AWE Burghfield - LC24 Compliance inspection
18-059 11 June 2018 Planned Licence Condition 11 Inspection
18-041 22, 23 May 2018 AWE Compliance inspection of Licence Conditions 22 and 23

Cavendish Nuclear

IR no LC no(s) Date Title
18-118 17 July 2018 Arrangements for management of equivalent spares to Hartlepool power station

Chapelcross [Nuclear Site Licence 15]

IR no LC no(s) Date Title
18-024 2, 19, 20, 21 April 2018 Chapelcross - Compliance inspections

Cyclife UK Limited [Nuclear Site Licence 91]

IR no LC no(s) Date Title
18-082 11, 14, 15 September 2018 Compliance inspections for LCs 11, 14 and 15

Devonport Royal Dockyard [Nuclear Site Licence 50B]

IR no LC no(s) Date Title
18-143 N/A October 2018 Readiness Review in advance of restart of Crane Refuel Operations
18-139 11 October 2018 LC 11 Emergency Arrangements inspection
18-127 35 October 2018 LC 35 Compliance inspection
18-121 23, 24, 27, 28 September 2018 VDMP Battery Tank Vulcanisation review
18-113 18 September 2018 DRDL - IRR17 and LC18 Compliance inspections
18-098 17 July 2018 DRDL - LC17 Compliance inspections
18-090 10, 23, 24, 27, 28 July 2018 System Based Inspection (SBI) of the Nuclear Fire Protection Systems on 9 Dock
18-069 23, 24 June 2018 DRDL - LC23 and LC24 Compliance Inspections
18-050 N/A June 2018 Intervention to sample the effectiveness of the Independant Nuclear Assurance (INA) function at DRDL
18-045 25 May 2018 DRDL –  LC25 Inspection
18-043 27, 28 May 2018 LC 27 and 28 Compliance Inspection
18-018 N/A May 2018 DRDL -  Planned Inspection
18-017 4, 5 April 2018 Intervention conducted at Devonport Royal Dockyard Limited Devonport licensed site
18-012 15 April 2018 LC15 inspection of the Nuclear Utilities Building PRS

Doosan Babcock

IR no LC no(s) Date Title
       

Dounreay [Nuclear Site Licence 15]

IR no LC no(s) Date Title
18-078 N/A August 2018 Planned compliance inspection - work at height, workplace transport and CDM arrangements
18-059 35 July 2018 LC35 Compliance Inspection and IIS 100 series inspection activities
18-036 N/A June 2018 Dounreay DSRL – To confirm compliance with the Fire (Scotland) Act 2005
18-035 N/A June 2018 Dounreay - Transport Interventions to support GB/4469, GB/2816 and GB/4085A Package Permissioning
18-011 N/A April 2018 Dounreay Site Restoration Ltd (DSRL), supply chain arrangements 

Dungeness A [Nuclear Site Licence 94]

IR no LC no(s) Date Title
18-077 N/A August 2018 Dungeness A Power Station (Decommissioning)

Dungeness B [Nuclear Site Licence 61]

IR no LC no(s) Date Title
18-131 28 September 2018 R22 2018 Outage – Mechanical Engineering Inspection
18-129 22, 26 October 2018 Dungeness B - LC22 planned inspection and unannounced LC26 inspection
18-124 28 September 2018 LC 28 Inspection of Electrical related aspects
18-117 7, 26, 28 September 2018 Dungeness B - Licence Condition Compliance inspection of LC7, 26 and 28
18-111 28 September 2018 Dungeness B - Planned inspections
18-103 2, 16 August 2018 Licence condition compliance inspections – LC2 and LC16
18-079 10, 23, 24 June 2018 Dungeness B - IJCO SOI Implementation Inspection
18-074 10, 23, 24, 27, 28 June 2018 Dungeness B - Fire Protection System Based Inspection (SBI11)
18-058 10, 23, 24, 27, 28, 34 May 2018 System Based Inspection SBI-012, Fuelling Machine and Decay Store
18-030 N/A May 2018 Dungeness B - Fire Safety Inspection
18-025 11 May 2018 Observation of Level 1 Emergency exercise demonstration and routine engagement.
18-006 6 April 2018 Dungeness B - Planned inspections

EDF Energy, Nuclear Generation Ltd corporate

IR no LC no(s) Date Title
18-118 17 July 2018 Arrangements for management of equivalent spares to Hartlepool power station
18-101 36 August 2018 Corporate - LC36 Intervention

GE Healthcare, Amersham [Nuclear Site Licence 13]

IR no LC no(s) Date Title
       

GE Healthcare, Maynard Centre, Cardiff [Nuclear Site Licence 38B]

IR no LC no(s) Date Title
       

Hartlepool [Nuclear Site Licence 59]

IR no LC no(s) Date Title
18-147 7 October 2018 Hartlepool - LC7 inspection
18-132 32 September 2018 LC 32 Planned compliance inspection
18-126 10, 23, 24, 27, 28 September 2018 SBI09 - Transformers, grid systems and main electrical systems
18-123 10, 23, 24, 27, 28, 34 September 2018 System Based Inspection 04 - Auxiliary Cooling System
18-118 17 July 2018 Arrangements for management of equivalent spares to Hartlepool power station
18-110 2, 16, 26 August 2018 Licence condition compliance inspections - LC2,  LC16 and LC26
18-085 11 July 2018 Hartlepool - Planned Compliance Inspection
18-066 7, 22, 23, 24, 25 June 2018 Hartlepool - Planned Compliance Inspection
18-034 36 April 2018 Hartlepool - Planned Compliance Inspection
18-007 12 April 2018 Hartlepool - Planned Compliance Inspection [18-007]

Harwell [Nuclear Site Licence 101]

IR no LC no(s) Date Title
18-060 11 July 2018 Magnox Ltd Harwell - Compliance Inspection of LC 11
18-025 10, 17, 26, 36 May 2018 Magnox Ltd Harwell – Operational Standards Inspection

Heysham 1 [Nuclear Site Licence 60]

IR no LC no(s) Date Title
18-135 22 September 2018 Planned LC 22 Compliance inspection
18-134 10, 23, 24, 27, 28 October 2018 SBI 29 – Buildings, Structures and Infrastructure
18-096 11 July 2018 Heysham - Emergency Arrangements review
18-082 28 July 2018 Heysham 1 – LC28 Mechanical Engineering Inspection
18-081 28 July 2018 Heysham 1 - LC28 Structural Integrity Inspection
18-078 N/A July 2018 Heysham 1 - Conventional Health and Safety Inspection
18-077 26 July 2018 Heysham 1 - LC26 Planned Compliance Inspection
18-073 28 July 2018 Heysham 1 - Inspection of Electrical Related Aspects
18-071 28 July 2018 Heysham 1 - C & I Inspection
18-068 28 July 2018 Reactor 2 2018 Statutory Outage Civil Engineering LC 28 Inspection
18-054 N/A June 2018 INA Quarterly Meeting
18-049 36 May 2018 Heysham 1 - LC36 Organisational Capability
18-023 7, 14 May 2018 Heysham 1 - LC7 and LC14 Compliance Inspections
18-021 28 May 2018 Heysham 1 - Pre-Outage Inspection
18-010 10, 23, 24, 27, 28 April 2018 Heysham 1 - Transformers, Grid Systems, and Main Electrical System (SBI 09)
18-002 10, 11, 23, 24, 25 April 2018 Heysham 1 - Licence Condition Compliance Inspections covering LC10, 11, 23, 24, 25

Heysham 2 [Nuclear Site Licence 60]

IR no LC no(s) Date Title
18-146 12, 22 October 2018 Heysham 2 - LC12 and LC22 Compliance inspection and ARoS
18-115 10, 23, 24, 27, 28 Septmber 2018 SBI 03 – Boiler Feed System
18-108 7, 14 August 2018 Heysham 2 - LC 7 and LC 14 compliance inspections
18-096 11 July 2018 Heysham - Emergency Arrangements review
18-087 N/A July 2018 Heysham 2 - Fire Safety inspection
18-072 10, 23, 24, 27, 28, 34 July 2018 Heysham 2 - SBI02 Inspection
18-64 28 June 2018 Reactor 7 Mechanical Engineering Shutdown Inspection
18-060 28 June 2018 Reactor 7 statutory outage Control and Instrumentation (C&I) inspection
18-056 N/A June 2018 Heysham 2 - Reactor Unit 7 Statutory Outage 2018 Radiological Protection Inspection
18-052 28 June 2018 Heysham 2 – Structural Integrity Inspection
18-048 30 May 2018 Heysham 2 - LC30 Inspection
18-040 28 May 2018 Reactor 7 Graphite Core Inspection Arrangements during its 2018 Statutory Outage
18-038 26, 28 May 2018 Heysham 2 - Reactive Inspection
18-037 N/A May 2018 Heysham 2 - Conventional Health and Safety Inspection
18-035 28 May 2018 Reactor 7 Periodic Shutdown - LC 28 Inspection of Electrical Related Aspects
18-015 8 April 2018 Heysham 2 - LC8 Inspection
18-008 6, 10, 23, 24, 27, 28, 34 April 2018 Heysham 2 - SBI01 and LC6 Inspection
18-001 10, 11, 23, 24, 25 April 2018 Heysham 2 - Flood Themed Inspection

Hinkley Point A [Nuclear Site Licence 95]

IR no LC no(s) Date Title
18-048 4, 5, 7, 18, 28 June 2018 Hinkley Point A - LC4, 5, 7, 18, 28 and Ionising Radiation Regulations 2017 inspection

Hinkley Point B [Nuclear Site Licence 62C]

IR no LC no(s) Date Title
18-138 10, 23, 24, 27, 28 October 2018 System Based Inspection - SBI03 - Boiler Feed
18-119 10, 23, 24, 27, 28, 34 September 2018 SBI 19 - Irradiated Fuel Dismantling Facility
18-114 11 September 2018 Hinkley Point B - Level 1 demonstration exercise
18-106 7, 36 August 2018 Hinkley Point B - Planned compliance inspections
18-089 5, 18 July 2018 Hinkley Point B - LC5 and LC18 Inspections
18-061 10, 23, 24, 27, 28 June 2018 Hinkley Point B - SBI09 Electrical Systems
18-028 N/A April 2018 Planned Conventional Health and Safety Inspection during statutory outage
18-027 28 April 2018 Hinkley Point B - Structural Integrity Inspection
18-024 N/A April 2018 Hinkley Point B - Radiological Protection Inspection
18-020 28 April 2018 Hinkley Point B - Electrical Inspection
18-016 28 April 2018 Hinkley Point B - Control and Instrumentation inspection
18-011 28 April 2018 Hinkley Point B - R4 2018 Outage-Mechanical Engineering Inspection
18-005 26 April 2018 Hinkley Point B - LC26 Inspection

Hinkley Point C [Nuclear Site Licence 97]

IR no LC no(s) Date Title
18-012 19 August 2018 Hinkley Point C - LC19 intervention
18-011 5, 8 August 2018 Hinkley Point C - LC5 and LC8 intervention
18-010 36 August 2018 Assessment process against LC 36 (1) and to determine if regulatory issue 5683 can be closed
18-009 19 July 2018 Hinkley Point C - Routine compliance inspection of Licence Condition 19
18-008 17, 36 July 2018 Inspection of Licence Conditions 17 and 36 focused on Nuclear Safety Culture Development
18-007 7, 19 June 2018 Hinkley Point C (HPC) - LC7 and LC19 intervention
18-006 36 May 2018 Hinkley Point C - LC36 compliance arrangements
18-005 17 May 2018 Hinkley Point C - To perform combined intervention on NNB HPC project on the subject of quality
18-004 17 May 2018 Hinkley Point C - BYLOR suppliers intervention
18-003 20 May 2018 Hinkley Point C - Capture and management of future activities as defined within LC 20 arrangements
18-002 17 April 2018 Hinkley Point C - To examine the overall effectiveness of NNB GenCo’s internal regulator function
18-001 17 April 2018 Hinkley Point C - ONR inspection of NNB GenCo’s conduct of supply chain surveillance

HM Naval Base Clyde

IR no LC no(s) Date Title
18-014 N/A April 2018 Clyde - IRR17 Inspection

Hunterston A [Nuclear Site Licence 16]

IR no LC no(s) Date Title
18-022 26, 32, 35, 36 April 2018 Hunterson A - Planned compliance inspections

Hunterston B [Nuclear Site Licence 13]

IR no LC no(s) Date Title
18-150 10, 23, 24, 27, 28 October 2018 Systems Based Inspection - SBI22 - CO2 Systems
18-148 11 October 2018 Hunterston B - LC11 - Level 1 Demonstration Exercise
18-142 36 September 2018 Hunterston B - LC 36 Compliance inspection
18-109 10, 23, 24, 27, 28 August 2018 Systems Based Inspection (SBI) 09 – Transformers, Grid Systems and Main Electrical Systems
18-093 7 July 2018 Hunterston B - LC7 Inspection
18-037 N/A June 2018 Hunterston B - Annual Review of Safety, Security Exercise and Joint SEPA Inspection
18-055 6 May 2018 Licence Condition 6 Compliance Inspection
18-033 10, 23, 24, 27, 28, 34 May 2018 System Based Inspection SBI-02 - Data Processing and Auto Control Systems
18-032 16, 22 April 2018 Hunterston B - Licence Condition 16 and 22 compliance inspections
18-029 N/A May 2018 Hunterston B - Follow-up Safety Inspection

Imperial College [Nuclear Site Licence 7B]

IR no LC no(s) Date Title
18-117 10, 12 October 2018 LC10 and LC12 Compliance inspection

Low Level Waste Repository (LLWR) [Nuclear Site Licence 82]

IR no LC no(s) Date Title
18-014 4, 5 May 2018 LLW Repository (LLWR) Cumbria Inspections for LCs 4 and 5

Magnox corporate

IR no LC no(s) Date Title
       

Oldbury [Nuclear Site Licence 57A]

IR no LC no(s) Date Title
18-070 8, 28 July 2018 Compliance inspection of LC8: Warning notices, and LC28 Examination, inspection, maintenance and testing

Operational berths

IR no LC no(s) Date Title
       

Rolls-Royce Marine Power Operations Ltd, Derby [Nuclear Site Licences 13C & 49]

IR no LC no(s) Date Title
18-100 23, 24, 25, 26 August 2018 Licence condition compliance inspections – Control and Supervision of Operations themed intervention
18-095 8, 9, 10, 12 July 2018 RRSL - Themed Compliance inspection
18-048 N/A May 2018 RRMPOL - INA Function

Rosyth [Nuclear Site Licence 8]

IR no LC no(s) Date Title
18-128 11 September 2018 Rosyth - LC11 Demonstration Exercise Night Star 18

Sellafield [Nuclear Site Licence 103]

IR no LC no(s) Date Title
123 11 October 2018 Compliance inspection of Licence Condition 11 (emergency arrangements)
18-119 10, 23, 24, 27, 28, 34 October 2018 Sellafield Ltd. Nuclear licensed site - System Based Inspection of PFCS Ventilation System 
18-113 22 October 2018 Sellafield – B6 Diffuser Demolition – Tower Crane Operation readiness inspection
18-108 10, 23, 24, 27, 28, 34 October 2018 System Based Inspection (SBI) of Control & Instrumentation (C&I) Protection Systems in Finishing Line 5 (FL5)
18-102 11 October 2018 Emergency management capability re-demonstration at Sellafield
18-093 22 September 2018 Sellafield - LC 22 inspection of AGR Fuel Interim Storage at TR&S pond
18-088 36 September 2018 LC 36 Compliance inspection – Resilience on Sellafield Ltd’s nuclear licensed site
18-086 25 August 2018 Sellafield - LC 25 inspection of AGR Fuel Interim Storage at TR&S pond
18-084 22 August 2018 Revised building crane Safety Case and East End crane permissioning readiness review
18-076 35 August 2018 Sellafield - Compliance inspection of Licence Condition 35 (Decommissioning)
18-063 12, 26 July 2018 Special Nuclear Materials Operating Unit (SNM (OU)) LC12 and LC26 compliance inspection
18-062 25 July 2018 Intervention on Sellafield Source Database and HASS Reporting under LC 25(4) specification
18-058 N/A July 2018 Sellafield B27 Fire Safety Inspection
18-056 11 July 2018 Annual demonstration of emergency management capability (Exercise CITADEL) at Sellafield
18-043 35 June 2018 LC 35 Compliance Inspection – Infrastructure Inactive Tank Farm, Sellafield
18-041 26 June 2018 The Magnox Swarf Storage Silo (MSSS) on the Sellafield Ltd. nuclear licensed site
18-037 27, 28 June 2018 Special Nuclear Materials Operating Unit (SNM OU) compliance inspection and INF1 follow up
18-023 7 May 2018 Planned Licence Condition Compliance Inspection covering LC7
18-008 11 April 2018 Sellafield Ltd - LC11 Compliance inspection
18-001 32 April 2018 LC32 Compliance Inspection - National Nuclear Laboratory Central Laboratory at Sellafield Ltd

Sizewell A [Nuclear Site Licence 96]

IR no LC no(s) Date Title
18-045 10, 12, 23, 24, 27, 28, 34, 36 June 2018 Bradwell and Sizewell A - SBI on Preparations for Care and Maintenance Operations

Sizewell B [Nuclear Site Licence 63]

IR no LC no(s) Date Title
18-153 10, 14, 23, 24, 27, 28 October 2018 Sizewell B - SBI19 Essential Power Supply System
18-141 11 September 2018 Sizewell B - Planned LC11 inspection
18-107

10, 23, 24, 27, 28, 34, 36

August 2018 Sizewell B - SBI12 and other inspections
18-092 6, 22, 26 July 2018 Sizewell B - Planned Compliance Inspections
18-084 11, 36 June 2018 Sizewell B – Planned Compliance Inspections
18-057 10, 23, 24, 26, 27, 28, 34 June 2018 Sizewell B – SBI 11 Inspection
18-044 10, 23, 24, 27, 28 May 2018 SBI02 Inspection
18-039 N/A May 2018 Sizewell B - Fire Safety Inspection
18-019 7, 10, 23, 24 May 2018 Sizewell B - LC Compliance Inspection
18-003 10, 23, 24, 26 April 2018 Sizewell B - External Hazards Safety Case

Springfields [Nuclear Site Licence 79]

IR no LC no(s) Date Title
18-085 N/A August 2018 Site Inspection to ensure compliance with the Regulatory Reform (Fire Safety) Order 2005
18-010 10, 13, 17, 26, 36 April 2018 Springfields Fuels Ltd - Operational standards compliance inspection

Torness [Nuclear Site Licence 14]

IR no LC no(s) Date Title
18-144 28 October 2018 Reactor 2 Outage - Mechanical Engineering inspection
18-140 24 October 2018 LC24 Compliance inspection - Procedure use and adherence
18-137 28 October 2018 Reactor 2 Outage - Control and Instrumentation inspection
18-133 28 October 2018 LC 28 Inspection of Electrical related aspects
18-130 28 October 2018 Reactor 2 Outage - Graphite inspection
18-125 N/A September 2018 Torness - Fire Safety inspection
18-120 30 September 2018 Torness - Outage Inspections - Conventional Safety and Rapid Trending Review
18-116 28 October 2018 Torness – LC28 Structural Integrity inspection
18-104 10, 23, 24, 27 28, 34 August 2018 SBI 12 Fuelling Machine and Decay Store
18-094 2, 16, 36 July 2018 Torness - LC2, LC16 and LC36 inspections
18-063 10, 23, 24, 27, 28 June 2018 Torness - SBI05 Seawater Systems and Fuel Route Improvement Plan
18-046 11 May 2018 Torness - LC11 Inspection
18-022 10, 23, 24, 27, 28 April 2018 Torness - SBI04 Inspection

Transport (Site licence N/A)

IR no LC no(s) Date Title
       

Trawsfynydd [Nuclear Site Licence 81]

IR no LC no(s) Date Title
18-094 24, 26, 28 September 2018 Trawsfynydd Power Station Planned Licence Condition Compliance Inspection

Urenco UK Limited, Capenhurst [Nuclear Site Licence 48E]

IR no LC no(s) Date Title
18-121 N/A October 2018 Site inspection to ensure compliance with the Fire Safety Order 2005
18-047 17 June 2018 Capenhurst TMF Project – LC 17 Inspection
18-006 N/A April 2018 Site Inspection to ensure compliance with the Regulatory Reform (Fire Safety) Order 2005

Vulcan

IR no LC no(s) Date Title
       

Winfrith [Nuclear Site Licence 100]

IR no LC no(s) Date Title
18-052 N/A June 2018 Tradebe Inutec - Tenant at Magnox Ltd Winfrith licensed nuclear site
18-012 32, 34, 35 April 2018 Winfrith - Planned Topic Area Compliance Inspection
18-005 N/A April 2018 Winfrith - Compliance inspection (fire safety)

Wylfa [Nuclear Site Licence 58A]

IR no LC no(s) Date Title
18-061 22, 23, 24 July 2018 Wylfa - Compliance inspection and Annual Regional Review of Safety Security and Environment meeting
18-030 11, 26, 28 June 2018 Planned Licence Condition Compliance Inspection and Site Stakeholders Group meeting
18-007 N/A April 2018 Wylfa - Fire safety inspection